100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

FDOT Earthwork Level 1 Exam Questions With 100% Correct Answers.

Rating
-
Sold
4
Pages
8
Grade
A+
Uploaded on
17-11-2023
Written in
2023/2024

Basics covered in Level 1 -Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? -Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - 6" of compacted depth at full width In Earthwork what is a Lot? - A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for - Done for base, sub grade, and embankment. Sampling is determined how - generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway - Minimum of three representative sample combined. What is LIMS? - Laboratory Info Management System The proctor theory is when compaction is achieved how - by inputting energy to expel air and water in the soil voids Compaction causes - An increase in unit weight, decrease in compressibility and permeability. The proctor is determined where and creates what - In a laboratory and establishes a density standard to be used on the roadwayLab proctors are created how - Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in - It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how - With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. What is a standard proctor used in - It is used in embankment and structure back fill materials Standard proctors are created how - With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total

Show more Read less
Institution
FDOT Earthwork Level 1
Course
FDOT Earthwork Level 1









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT Earthwork Level 1
Course
FDOT Earthwork Level 1

Document information

Uploaded on
November 17, 2023
Number of pages
8
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

FDOT Earthwork Level 1 Basics covered in Level 1 - ✔✔ Nuclear Testing Speedy Moisture Report Forms Earthwork ha s to do with the roadway in what way? - ✔✔ Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - ✔✔ 6" of compacted depth at full width In Earthwork what is a Lot? - ✔✔ A lot is 1 li ft at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for - ✔✔ Done for base, sub grade, and embankment. Sampling is determined how - ✔✔ generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway - ✔✔ Minimum of three representative sample combined. What is LIMS? - ✔✔ Laboratory Info Management System The proctor theory is when compaction is achieved how - ✔✔ by inputting energy to expel air and water in the soil voids Compaction causes - ✔✔ An increase in unit weight, decrease in compressibility and permeability. The proctor is determined where and create s what - ✔✔ In a laboratory and establishes a density standard to be used on the roadway Lab proctors are created how - ✔✔ Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in - ✔✔ It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how - ✔✔ With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. What is a standard proctor used in - ✔✔ It is u sed in embankment and structure back fill materials Standard proctors are created how - ✔✔ With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total Comparison between VT and QC density test tolerance - ✔✔ 2 lbs/pcf What is the STRG - ✔✔ Sampling, Testing, and Reporting Guide (state wide) A job guide schedule is - ✔✔ project specific The material identification number for embankment in the laboratory is - ✔✔ 004L The material identification number for embankment in the field is - ✔✔ 004F The material identification number for base is - ✔✔ 030 PP is short for - ✔✔ project personel

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PatrickKaylian Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1805
Member since
2 year
Number of followers
1043
Documents
22101
Last sold
20 hours ago

3.8

315 reviews

5
146
4
60
3
54
2
15
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions