100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CMRP Exam - Questions & Verified Answers

Rating
-
Sold
1
Pages
10
Grade
A+
Uploaded on
17-10-2023
Written in
2023/2024

CMRP Exam - Questions & Verified Answers

Institution
CERTIFIED MAINTENANCE & RELIABILITY PROFESSIONAL
Course
CERTIFIED MAINTENANCE & RELIABILITY PROFESSIONAL









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CERTIFIED MAINTENANCE & RELIABILITY PROFESSIONAL
Course
CERTIFIED MAINTENANCE & RELIABILITY PROFESSIONAL

Document information

Uploaded on
October 17, 2023
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CMRP Exam - Questions & Verified Answers
Replacement Asset Value (RAV) ✔️Ans - defined as the cost that would be
incurred, in today's dollars, to replace the facility and equipment in its current
configuration.

Overall Equipment Effectiveness (OEE) ✔️Ans - metric for measuring how
well a process is operating by evaluating the three major process components:
availability, performance efficiency (rate/speed) and quality. The process can
be a single piece of equipment, a manufacturing cell, a production line or a
plant

Overall Equipment Effectiveness (OEE) ✔️Ans - Availability × Performance
Efficiency × Quality

Availability ✔️Ans - defined as the percentage of time that the process is
actually operating (uptime) compared to when it is scheduled to operate

Performance efficiency (rate/speed) ✔️Ans - defined as the percentage of
Actual Run Rate/Cycle Time to the Best Run Rate/Cycle Time

Quality ✔️Ans - defined as the percentage of "First Pass, First Time"
Saleable Production to the Actual Production

Actual Production ✔️Ans - total quantity of production produced in the
given time period, regardless of its quality

Lagging Indicator ✔️Ans - An indicator that measures performance after
the business or process result starts to follow a particular pattern or trend

Leading Indicator ✔️Ans - An indicator that measures performance before
the business or process result starts to follow a particular pattern or trend

Three (3) sets of measurable components that make up the maintenance and
reliability process ✔️Ans - 1. Management processes and behaviors
(mission and vision, people skills)
2. Operational execution (operations, design and maintenance)
3. Manufacturing performance (availability, quality, cost and benefits)

, mean metrics ✔️Ans - metrics that describe the Reliability, Availability and
Maintainability (RAM) characteristics of a component, asset or even facility

Inherent Availability ✔️Ans - measure of the variables inherent in the
design that affect availability. In the calculation of downtime, it usually
includes only active repair time. It does not include preventive maintenance
time and administrative or logistic delays, but does include corrective
maintenance downtime

Inherent Availability Formula ✔️Ans - Ai = MTBF / (MTBF + MTTR)
Where MTBF = Mean Time Between Failures
And MTTR = Mean Time to Repair (corrective maintenance only)

Achieved Availability ✔️Ans - probability that an item, when used under
design conditions in an ideal support environment, will perform satisfactorily.
It includes both active repair time and preventive maintenance time, but
excludes administrative and logistic delay times

Achieved Availability Formula ✔️Ans - Aa = MTBM / (MTBM + MDTM)
Where MTBM = Mean Time Between Maintenance
And MDTM = Mean Downtime for Maintenance

Operational Availability ✔️Ans - probability that an item, when used under
design conditions in an operational environment, will perform satisfactorily. It
includes active repair time, preventive maintenance time and administrative
and logistic delays and represents the availability that is actually experienced

Operational Availability Formula ✔️Ans - Ao = MTBM / (MTBM + MDT)
Where MTBM = Mean Time Between Maintenance
And MDT = Mean Down Time

Equipment Availability ✔️Ans - defined by The Association for
Manufacturing Technology as the percentage of potential production time
during which equipment is operable. The term is applied to a single piece of
manufacturing equipment (or several machines acting as a unit)

Equipment Availability Formula ✔️Ans - = [Production Time / Potential
Production Time] x 100

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Krisella Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
833
Member since
3 year
Number of followers
673
Documents
6492
Last sold
3 weeks ago
\"Study Smarter, Achieve Greater.\"

Welcome, this is the perfect place to find the study materials you need to thrive academically. Think of it as your personal study sanctuary—where you can access well-organized, comprehensive, and easy-to-understand notes that help you learn with confidence. I understand how challenging studying can be, which is why I’ve made it my mission to provide you with the best resources to simplify your learning journey. Whether you’re tackling difficult subjects, preparing for exams, or just looking to strengthen your understanding, my carefully crafted study guides, notes, and summaries are designed to meet your unique academic needs. Just like a cozy nest, I want my page to be your go-to space for knowledge, growth, and success. With resources that are clear, concise, and insightful, you’ll feel confident and prepared every step of the way. Thank you for trusting this page with your academic success. Let’s build a foundation for your learning and help you soar to new heights!

Read more Read less
4.1

172 reviews

5
102
4
27
3
22
2
8
1
13

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions