Construction Management – JumpStart Questions and Answers 100% Pass
Construction Management – JumpStart Questions and Answers 100% Pass Distinguish between construction management as a function and construction management as a project delivery method. The construction management function entails various tasks performed by the contractor such as estimating, scheduling, cost control, and contact administration in order to monitor, manage, and control the work of the contract for which the contractor is obligated. Construction management as a project delivery method is a contractual agreement whereby the construction manager is hired by the owner to provide services to the owner, such as design review, overall scheduling, cost control, value engineering, constructibility reviews, and construction coordination. Under CM project delivery, the construction manager may or may not be financially obligated to carry out the construction work itself. Identify at least three characteristics that make the construction project unique from other industry sector projects. Each construction project is built as a one-of-a-kind structure or facility. Every construction project is built on a different and unique building site. The building process takes place outside. Much of the work is performed by the human hand. The labor force is by and large made up of transient workers moving from job to job. Name the four primary project values to be managed, monitored, and controlled. Time, cost, quality and safety Why is scope definition so important in the construction process? It describes the extent of the work that is to be performed by the contractor. What is meant by the term "project delivery?" the overall structural or organizational framework used to put all the aspects of designing and building a construction project together. Identify the three primary project delivery methods and discuss how they differ contractually. 1. Design-bid-build : separate contracts with designer and contractor 2. Design-build : one contract between the owner and the design-build entity 3. Construction Management : owner holds three contracts - with construction manager, designer, and contractor Explain how agency CM is different from at-risk CM Difference is in regard to who is responsible for performing the actual work of the contract. Under agency CM, the construction manager has no liability for the construction and acts only as an agent or advisor to the owner. With at-risk CM, the construction manager acts as an advisor to the owner during the design phase and is liable for the construction. What is meant by the term "fast tracking?" Fast tracking is a technique used to speed up the completion of a construction project by overlapping the design and construction processes. Name the three basic ways in which a design-build entity may be configured. 1. Have the contractor and the designer create an informal partnership for a project 2. Have a full-service design-build firm in which the designers and the contractors work for the same company 3. Establish a legal joint venture between designer and contractor for a single project Identify the eight functions of construction management. 1. Estimating the project 2. Contract administration 3. Managing job site and construction operations 4. Planning and scheduling the project 5. Controlling project performance 6. Managing project quality 7. Managing project safety 8. Managing project risks Why is open bidding required on public projects? Because taxpayer dollars are at stake, and an open bid allows any contractor to submit, reducing the risk of fraud, favoritism, and undue influence and reassuring taxpayers that their tax dollars are being spent properly Name a tool used to reduce the number of bidders on a public project and increase the quality of the contractor pool. Requirement for a pre qualification statement What is the purpose of labor and materials payment bond? It is a guarantee, backed by a surety, that payment for the contractor's labor and materials used on the project will be made Identify the notice document that informs the public of upcoming construction projects funded with taxpayer dollars. An advertisement for bids. These ads are typically posted electronically through construction project lead services but may
Geschreven voor
- Instelling
- Construction Management
- Vak
- Construction Management
Documentinformatie
- Geüpload op
- 2 oktober 2023
- Aantal pagina's
- 19
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
construction management jumpstart questions and
Ook beschikbaar in voordeelbundel