CDT EXAM Q & A 100% CORRECT.
CDT EXAM Q & A 100% CORRECT. payment bonds - CORRECT ANSWER-They are usually issued by contractors. The payment bond is referred to as the labor and material payment bond. They are used to guarantee that subcontractors and material suppliers will pay. The payments bounds. Contract bond is known as contract bond, and they are issued by an insurance company or bank to guarantee completion of the project by the contractor. Who acquires and pays for the building permit? - CORRECT ANSWER-The contractor Life cycle - CORRECT ANSWER-The life cycle of a facility, from concept through construction to use and eventual deconstruction (demolition), follows a number of stages: Project conception, project delivery methods, design, construction documents, bidding/negotiating/purchasing, construction, and facility management. Life cycle - CORRECT ANSWER-Includes, planning, construction, evaluation, demolition During the Planning/Pre-Design Phase, the A/E may be retained to: - CORRECT ANSWER-Assist in financial feasibility studies Planning/Pre-Design Phase - CORRECT ANSWER-Project conception is often a creative stage for the owner; it requires a clear understanding of project values and goals which become the basis of many decisions. A facility program documents these decisions, resulting in a framework for future design decisions, operational procedures, and determining project feasibility. During which project phase does the A/E review the owner's program and budget requirements and suggest alternative approaches? - CORRECT ANSWER-Design In which phase are the specifications produced? - CORRECT ANSWER-Design Phase- Construction Documents The Construction Phase begins... - CORRECT ANSWER-When the agreement is executed The Design Phase includes - CORRECT ANSWER-Surveys ,Design Development, Schematic Design,Bid Security The specification type document prepared during the Design Development phase is called the: - CORRECT ANSWER-Outline Specification What activities take place in the planning/pre-design phase? - CORRECT ANSWERFeasibility studies and budget is set Which phase fixes and describes the size and character of the entire project? - CORRECT ANSWER-Design Phase - Design Development Phase Whose responsibility is it to produce the shop drawings? - CORRECT ANSWER-The Contractor articles in PART 1 - CORRECT ANSWER-References and related documents, summary, Definitions, Submittals and procedures , Sequencing and Scheduling, transmital. Part 1 general - CORRECT ANSWER-Describes administrative, procedural, and temporary requirements unique to the section. PART 1 is an extension of subjects covered in Division 01 and amplifies information unique to the section. Project/Site Conditions - CORRECT ANSWER-Existing conditions that affect the application of other materials,Limitations such as temperature or weather that affect proper installation, An example of a level three section is: - CORRECT ANSWER-052150 Open Web Steel Joists Division numbers are fixed, but specification section
Written for
- Institution
- CDT
- Course
- CDT
Document information
- Uploaded on
- September 29, 2023
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- payment bonds
- life cycle
- cdt exam q a 100 correct
-
who acquires and pays for the building permit
-
planningpre design phase
-
in which phase are the specifications produced
-
the design phase includes