NFPA 24 Test (TFM10) exam with complete solution graded A+
Combined Service Mains -This standard shall apply to ______ intended to carry water for fire service mains AHJ - Working plans shall be submitted for approval to the _____ before any equipment is installed or remodeled. Pressure-Regulating devices - ____ shall not be used Control Valves - ______ shall not be installed in the piping from the fire department connection to the fire service main Control Valves - _____ shall be permitted in the system downstream of the fire department connection Check Valve - When more than one water supply exists, a ___________ shall be installed in each connection Control Valve - All check valves shall have a ________ installed upstream and downstream of the check valve. 40 ft - A post indicator valve installed not less than____ from the building 32-40 inches - Where post indicator valves are used, they shall be set so that the top of each post is _______ above final grade not be required - Supervision of underground gate valves with roadway boxes shall ____________ not be less than 6 inches - The connection from the hydrant to the main shall ___________not less than 40 ft - Hydrants shall be located _________ from the buildings to be protected
Written for
- Institution
- NFPA 24
- Course
- NFPA 24
Document information
- Uploaded on
- September 24, 2023
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal