• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

CDFM Module 4

Document preview thumbnail
Preview 2 out of 11 pages

What is JCIDS (Joint Capabilities Integration and Development System)? - Answer assesses gaps in military joint warfighting capabilities and recommends solutions to resolve these gaps Defense Acquisition System - Answer Process by which DoD acquires weapon systems and automated information systems What document provides entry into Milestone A the the Defense Acquisition System? - Answer Materiel Development Decision What are the two steps in pre-systems acquisition? - Answer Materiel solution analysis and technology development Which milestone is the program initiation? - Answer Milestone B The MDA may authorize entry into the acquistion system at any point? True or False - Answer True What are the most expensive programs? - Answer ACAT IA Who is the single point of accountability for accomplishing program objectives? - Answer program manager What says the DOD may not obligate funds for a major defense acquisition program after the program enters the Engineering and Manufacting phase? - Answer 10 USC 2435 What is systems engineering? - Answer overarching process that a program team applies to transition from a stated capability need to an operationally suitable system. It is the integrating mechanism across the technical efforts Program managers prepare a _________ for each milestone review, beginning with Milestone A. - Answer Systems Engineering Plan (SEP) Integrated Product and Process Development (IPPD) is - Answer mgmt technique that simultaneously integrates all essential acquisition activities through the use of multidisciplinary teams to optimize design, manufacturing and supportability processes. What are the 3 levels of IPT's - Answer Overachring Integrated Product Team (OIPT) that oversees entire program, Integrateing Integrated Product Team (IIPT), and Working Level Integrated Product Team (WIPT) that advise the PM What are the 8 technical management processes? - Answer 1. Decision Analysis 2. Technical Planning 3. Technical Assessment 4. Requirements Management 5. Risk Management 6. Configuration Management 7. Data Management 8. Interface Management


Document information

Uploaded on
September 14, 2023
Number of pages
11
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
2
Followers
2
Items
439
Last sold
2 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.