NERC RC EOP-005 (Correctly Answered)
What is the purpose of EOP-005? correct answers Assure reliability is maintained during system restoration. What is a Black Start Resource (BSR)? correct answers A Generating Unit(s) & Its Associated Set Of Equipment Which Has The Ability To Be Started Without Support From The System Or Is Designed To Remain Energized Without Connection To The Remainder Of The System Who must approve the Restoration Plan that every TOP must develop? correct answers The RC To what point is the restoration plan required to cover? correct answers Until the choice of the next load to be restored is not driven by the need to control frequency or voltage. What should the Restoration plan include? correct answers ¤ Strategies For Restoration That Coordinate With The RC's High Level Strategy For Restoring The Interconnection" ¤Descriptions Of How Procedures For The Off-Site Power Requirements Of Nuclear Plants Will Be Fulfilled" ¤Procedures For Restoring Interconnections With Other TOPs Under The Direction Of The RC" ¤ Identification Of Each BSR & Its Characteristics Including Name, Location, MW & Mvar Capacity & Type Of Unit" ¤ Identification Of Cranking Paths & Initial Switching requirements Between Each BSR & The Unit To Be Started" ¤ Identification Of Acceptable Operating Voltage & Frequency Limits" ¤ Procedure To Reestablish Connections Within The TOP's System For Areas That Have Been Restored" ¤Procedure To Restore Loads Required To Restore The System" ¡ Such As Station Service For Substations" ¡ Units To Be Restarted Or Stabilized" ¡ Load Needed To Stabilize Generation" ¤ Procedure For Transferring Authority Back To The BA"
Document information
- Uploaded on
- September 4, 2023
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers