WELL AP Certification 2023 with Complete Solutions
Which of the following is a requirement for projects pursuing WELL Certification? - ANSWER-Integrative Design Which of the following resources should be used to register a project for WELL certification? - ANSWER-WELL Online Which of the following combinations of applicable WELL Features would result in Core and Shell Compliance? - ANSWER-All Preconditions and one Optimization from each WELL Concept Which of the following would a project team be required to provide to maintain its status as a WELL Certified project? (Choose 2) - ANSWER-Results of post-occupancy surveys, Logs with proof of maintenance What minimum score must an existing 2 story retail building earn in any concept to qualify for WELL silver certification? - ANSWER-6 7 NOT 4 5 Which of the following conditions must be met for a new building project team to schedule the WELL Performance Verification? - ANSWER-Documentation approved, One Month from Certificate of Occupancy, 50% occupancy achieved Which of the following body system is NOT addressed by the WELL Building Standard v1? - ANSWER-None of the above Lymphatic system Digestive system Endocrine system Integumentary system How many days does a project team have to accept the WELL report? - ANSWER-180 The New and Existing Building typology is relevant for office buildings where a minimum of ___ of the total floor area is occupied by the building owner and is operated by the same management. - ANSWER-90% At what point should the project team schedule the Performance Verification for a Core and Shell Development? - ANSWER-After the Documentation Review phase is marked approved in WELL Online
Document information
- Uploaded on
- August 14, 2023
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers