• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 51 pages
Exam (elaborations)

LEED Green Associate Practice Exam Questions with 100% Verified | Latest Update Graded A+ |

Document preview thumbnail
Preview 4 out of 51 pages

Which one of the following defines nonpotable water? A. Water that meets drinking water standards B. Water that does not meet drinking water standards C. Greywater that has been treated on site to meet drinking water standards D. Rainwater harvesting - correct answers B. Water that does not meet drinking water standards Which of the following are examples of pre-consumer recycled content products? (Select 3) A. Concrete with fly ash from coal-fired power plants B. Metal studs made from scrapped automobiles C. Particle board made from old shipping pallets LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) D. Acoustical wall panel made with by-product from a plastic bottle manufacturing plant E. Asphalt paving with reprocessed asphalt removed from old parking lot F. Insulation made of scrap from denim jean manufacturing - correct answers A, D, F A. Concrete with fly ash from coal-fired power plants D. Acoustical wall panel made with by-product from a plastic bottle F. Insulation made of scrap from denim jean manufacturing All of the following are typical elements of a Construction and Demolition Waste Management Plan, except: A. A waste diversion goal B. Identification of types of waste to be generated during construction C. An estimate of the total weight or volume of each type of waste to be generated during construction D. Identification of local resources for recycling and salvage of materials LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) E. Communication plan to increase participation by jobsite personnel - correct answers C. An estimate of the total weight or volume of each type of waste to be generated during construction A developer is proposing a new office building on a former industrial site less than 1/4 mile from downtown, but a freeway separates the site from the restaurant and shopping district. In order to improve the community connectivity of this project, the developer could: A. Incorporate a strip mall and housing into the proposed development B. Propose a jogging trail and bike path connecting to a nearby park and community center C. Propose a gravel path be added to the one road that connects the project site to downtown via a freeway underpass and narrow shoulder D. Propose to provide discounted transit passes to future tenants of the office building - correct answers B. Propose a jogging trail and bike path connecting to a nearby park and community center LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) Where would information on the volatile organic compound content of an adhesive or sealant typically be found? A. Material Safety Data Sheet B. Environmental Protection Agency web site C. Department of Environmental Quality product registry D. USGBC's LEED complaint product database - correct answers A. Material Safety Data Sheet Increasing access to public transportation can provide which one of the following benefits? A. Reduced heat island effect B. Reduced requirements for bicycle parking C. Increased demand for road capacity D. Reduced vehicle miles traveled - correct answers D. Reduced vehicle miles traveled The Montreal Protocol included a ban on the production of CFC refrigerants in developing countries beginning in what year? A. 1992 LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) B. 1996 C. 2001 D. 2010 - correct answers D. 2010 Which of the following are considered rapidly renewable materials? (select 2) A. Oriented Strand Board (OSB) B. Linoleum C. FSC Certified Wood D. Wheatboard E. Ceramic tile - correct answers B, D B. Linoleum D. Wheatboard What types of equipment are Chlorofluorocarbons found in? (select 2) A. Fire suppression systems B. Rooftop package HVAC units C. Chillers LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) D. Fan coil units E. Air compressors - correct answers B, C B. Rooftop package HVAC units C. Chillers Two testing protocols established by the Carpet and Rug Institute are used to qualify low-emitting carpet systems and low-emitting carpet pads, respectively. Which of the following protocols apply? (select one) A. Green Guard for carpeting and Eco-label for carpet pad B. Green Seal Plus for carpeting and Green Seal for carpet pad C. Green Label Plus for carpeting and Green Label for carpet pad D. Green Guard for carpeting and Green Seal for carpet pad - correct answers C. Green Label Plus for carpeting and Green Label for carpet pad A new 8 acre development footprint is proposed on a 10 acre site. How much open space would be required to earn a LEED credit for open space? A. 2.25 acres B. 2.5 acres LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) C. 2.75 acres D. 3 acres - correct answers D. 3 acres A proposed mixed-use building includes a restaurant on the ground floor. Which of the following services located within walking distance of the project would contribute to Surrounding Density and Diverse Uses? (select 2) A. A bank B. A car dealership C. A hotel D. A hair salon E. The restaurant in the project F. An auto repair shop - correct answers A, D A. A bank D. A hair salon On-site renewable power can be generated using which of the following sources? (select 2) LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) A. Capturing gas from an old landfill on-site and burning it to produce energy B. Purchasing electricity from a wind-farm located 25 miles away C. Burning properly treated wood waste to produce energy D. Burning natural gas in a micro-turbine on-site E. Installing a geo-exchange heat pump system on-site F. Generating electricity from subterranean steam or heat - correct answers C, F C. Burning properly treated wood waste to produce energy F. Generating electricity from subterranean steam or heat Which one of the following scenarios would allow bamboo flooring to be considered both rapidly renewable and regional? A. Bamboo that is harvested oversees and shipped to a manufacturing facility 300 miles from the project site before delivery and installation B. Bamboo that is harvested 80 miles from the project site and shipped to a manufacturing facility 100 miles from the site before delivery and installation


Document information

Uploaded on
July 22, 2023
Number of pages
51
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers
$23.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExcelAcademia2026
3.7
(388)
Sold
2297
Followers
1650
Items
9004
Last sold
8 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.