ARE 5.0 Project Management Questions and Answers 5.0 PjM Exam 2023 solved completely
ARE 5.0 Project Management Questions and Answers 5.0 PjM Exam 2023 solved completely Out of the following insurances which is not required by the architect to maintain by the owner architect agreement? General liability, automobile liability, workers compensation, general commercial liability General commercial liability insurance is not required per AIA B101, but it is preferred Name 4 items that are effective organizational tools for a project manager at the beginning of a project; - Project description - Internal project budget - Project directory - Staffing requirements and needs The design Build framework has three stages; proposal, post-award, design phase. At what phase is the budget and schedule discussed reviewed and agreed to? The post-award phase Which of the following services are considered additional services per AIA B101: - Lead certification - Expedited submittal reviews - Project administration - Travel to and from the site - Procurement - Model making - Documentation of bid alternatives Lead certification, expedited some of the reviews, project administration, documentation of bid alternatives are all considered additional services. Travel to and from the site is not, procurement is a reimbursable expense, and model making is a reimbursable expense. An architect has been hired to design renovations for a 3000 square-foot home in Southern California including all new bathrooms and kitchens, new in large window and door openings, and relocation of some interior walls. As the architect repairs drawings and documents the contractor decides to begin work without a building permit in order to save time and money. The building department learns of the activity and issued a stop work order. What should the architect do? Stop drawing and ask the owner for additional services to modify the drawings based on what the contractor has done in order to obtain a building permit. Since the contractor acted out of sequence in not waiting for the drawings to be done in the project to be permitted, the architect is entitled to additional compensation to revise the drawings as needed to acquire a permit. According to the AIA A201, who pays for the taxes during the construction of the building? The general contractor pays all of the taxes for the work A drawing produced by the architects electrical engineering consultant has been found by the building official to be out of compliance with the current code for a project submitted another construction. Under AIA C141, the responsibility for this air lies solely on whom? The consultant as the professional in charge of scope. Under C-series contracts, the consultant is responsible for code compliance in their area of work. When reviewing submittals the architect is responsible for which of the following? - Instalation method - Quantities
Document information
- Uploaded on
- July 21, 2023
- Number of pages
- 22
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers