ARE 5.0 Project Management Questions and Answers 5.0 PjM Exam 2023 solved completely

Document preview thumbnail
Preview 3 out of 22 pages

ARE 5.0 Project Management Questions and Answers 5.0 PjM Exam 2023 solved completely Out of the following insurances which is not required by the architect to maintain by the owner architect agreement? General liability, automobile liability, workers compensation, general commercial liability General commercial liability insurance is not required per AIA B101, but it is preferred Name 4 items that are effective organizational tools for a project manager at the beginning of a project; - Project description - Internal project budget - Project directory - Staffing requirements and needs The design Build framework has three stages; proposal, post-award, design phase. At what phase is the budget and schedule discussed reviewed and agreed to? The post-award phase Which of the following services are considered additional services per AIA B101: - Lead certification - Expedited submittal reviews - Project administration - Travel to and from the site - Procurement - Model making - Documentation of bid alternatives Lead certification, expedited some of the reviews, project administration, documentation of bid alternatives are all considered additional services. Travel to and from the site is not, procurement is a reimbursable expense, and model making is a reimbursable expense. An architect has been hired to design renovations for a 3000 square-foot home in Southern California including all new bathrooms and kitchens, new in large window and door openings, and relocation of some interior walls. As the architect repairs drawings and documents the contractor decides to begin work without a building permit in order to save time and money. The building department learns of the activity and issued a stop work order. What should the architect do? Stop drawing and ask the owner for additional services to modify the drawings based on what the contractor has done in order to obtain a building permit. Since the contractor acted out of sequence in not waiting for the drawings to be done in the project to be permitted, the architect is entitled to additional compensation to revise the drawings as needed to acquire a permit. According to the AIA A201, who pays for the taxes during the construction of the building? The general contractor pays all of the taxes for the work A drawing produced by the architects electrical engineering consultant has been found by the building official to be out of compliance with the current code for a project submitted another construction. Under AIA C141, the responsibility for this air lies solely on whom? The consultant as the professional in charge of scope. Under C-series contracts, the consultant is responsible for code compliance in their area of work. When reviewing submittals the architect is responsible for which of the following? - Instalation method - Quantities


Document information

Uploaded on
July 21, 2023
Number of pages
22
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
450
Followers
309
Items
9193
Last sold
4 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.