This standard shall apply to ______ intended to carry water for fire service mains - correct answers ✅Combined Service Mains
Working plans shall be submitted for approval to the _____ before any equipment is installed or remodeled. - correct answers ✅AHJ
____ shall not be used - correct answers ✅Pressure-Regulating devices
______ shall not be installed in the piping from the fire department connection to the fire service main - correct answers ✅Control Valves
_____ shall be permitted in the system downstream of the fire department connection - correct answers ✅Control Valves
When more than one water supply exists, a ___________ shall be installed in each connection - correct answers ✅Check Valve
All check valves shall have a ________ installed upstream and downstream of the check valve. - correct answers ✅Control Valve NFPA 24 Test (TFM10) Exam Questions and Answers (Latest Update 2023-2024) (30 Qs)
A post indicator valve installed not less than____ from the building - correct answers ✅40 ft
Where post indicator valves are used, they shall be set so that the top of each post is _______ above final grade - correct answers ✅32-40 inches
Supervision of underground gate valves with roadway boxes shall ____________ - correct answers ✅not be required
The connection from the hydrant to the main shall ___________ - correct answers ✅not be less than 6 inches
Hydrants shall be located _________ from the buildings to be protected - correct answers ✅not less than 40 ft
Hydrants shall be installed on __________ - correct answers ✅flat stones, concrete slabs, or other approved material
This standard shall apply to ______ intended to carry water for fire service mains - correct answers ✅Combined Service Mains
Working plans shall be submitted for approval to the _____ before any equipment is installed or remodeled. - correct answers ✅AHJ
____ shall not be used - correct answers ✅Pressure-Regulating devices
______ shall not be installed in the piping from the fire department connection to the fire service main - correct answers ✅Control Valves
_____ shall be permitted in the system downstream of the fire department connection - correct answers ✅Control Valves
When more than one water supply exists, a ___________ shall be installed in each connection - correct answers ✅Check Valve
All check valves shall have a ________ installed upstream and downstream of the check valve. - correct answers ✅Control Valve NFPA 24 Test (TFM10) Exam Questions and Answers (Latest Update 2023-2024) (30 Qs)
A post indicator valve installed not less than____ from the building - correct answers ✅40 ft
Where post indicator valves are used, they shall be set so that the top of each post is _______ above final grade - correct answers ✅32-40 inches
Supervision of underground gate valves with roadway boxes shall ____________ - correct answers ✅not be required
The connection from the hydrant to the main shall ___________ - correct answers ✅not be less than 6 inches
Hydrants shall be located _________ from the buildings to be protected - correct answers ✅not less than 40 ft
Hydrants shall be installed on __________ - correct answers ✅flat stones, concrete slabs, or other approved material