NCCCO Core questions with correct answers
Wire rope installed on most cranes - Answer Right Regular Lay How many randomly broken wires in a lay length must there be on a mobile cranes hoist line before it should be removed from service? - Answer 6 Minimum design factor required for a right regular lay, boom or hoist wire rope - Answer 3.5 How many broken wires are permitted at the end connection of a pendant before it must be taken out of service - Answer 1 Type 1 rotation resistant hoist wire rope has a design factor of: - Answer 5 to 1 How many broken wires must be present in one strand of one lay for running wire rope to be removed from service - Answer 3 How many randomly distributed broken wires in rotation resistant hoist wire rope are considered for replacement - Answer 2 broken wires
Written for
- Institution
- NCCCO
- Course
- NCCCO
Document information
- Uploaded on
- June 14, 2023
- Number of pages
- 4
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nccco core questions with correct answers
Document also available in package deal