Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 4 van de 32 pagina's
Samenvatting

Summary Paper 1 case study sheet

Document preview thumbnail
Voorbeeld 4 van de 32 pagina's

A list of all the key case studies required for paper 1

Voorbeeld van de inhoud

The Water Cycle and Water Insecurity

AMAZON + MALAYSIA → South asian association for regional cooperation


Australia (2006-2007) - ‘The Big Dry’ drought
Key facts
- El Nino year
- Worst conditions during October and November
- Ended by a La Nina year
- Exacerbated by population demands
- Farmers and civilians disagreed over water use
- 1 in a 1000 year event
The problem/ context
- Australia is the driest continent- average rainfall is 455mm annually → lack of
water
- Predicted 7 degrees increase in temperature with a 40% decrease in rainfall by
2070 in eastern Australia
The consequences
- Rivers drying up → loss of wetland habitats, increase salinity, decrease fish stocks
and algal bloom
- Decline in water in Murray- Darling basin which provides ¾ of water nationally→
Australia’s food basket- contains half of Australia’s arable land and 70% of its
population
- Land degradation and increase bushfires and dust storms
- Reservoirs are depleted, irrigation restricted → crop yields are low → stocks are
low → Loss of 1% of economy in 2006-7
- In Melbourne the local government stated that the city’s water consumption was
16% lower in 2007 than 2006
Management
- Recycling ‘grey water’ (wastewater that is the product if domestic processes e.g
washing machines, bathing and washing) but it was not supported
- Desalination (process where salt and minerals are removed from water to make it
potable) plant was built in Western Australia and supplies 17% of Australia’s water
needs
- → Sydney proposes to build a $1.3billion desalination plant which will distribute
water to 1.5 million people
- → In Victoria, a larger project estimated at $3.1billion will begin in 2009 to deliver
an additional 150 billion litres of water to Melbourne and Geelong
- A North-South pipeline costing $750 million is being built in Victoria but has been
criticised by opponents as t takes water from the driest catchment areas to one of
the wettest (Melbourne)

,North West England - Cumbria floods 2009 and 2015
The facts (2009)
- Made up of several rivers e.g Greta, Cocker and Tyne
- 2009 → 31cm of rain fell in 24hrs daily flooding of Cockermouth and Eden Valley
Causes
- 2009 → depression was formed in the Atlantic Ocean → prevailing winds
65-90mph winds on the coastline pushed a conveyor belt of warm air towards land
→ air rose over Cumbrian mountains and cooled (RELIEF RAINFALL)
- 2009 → urbanisation, blocked sewers, inefficient flood defences, lack of dredging
leading to blockage of river
Responses
- 2009 → flood risk management scheme was implemented in Cockermouth
protected 400 homes and businesses → multiple flood defences such as
embankments and flood gates costing £45 million
- 2009 → Regular river dredging to increase river carrying capacity
- 2009 → Early warning systems and education
- 2009 →Businesses and homeowners moved to safer areas
The facts (2015)
- Hit by Storm Desmond with 341.4mm of rain → over-topping of flood defences
such as 2013 self-closing barriers
Meteorological factors (2015)
- Low pressure depression in the Atlantic
- Monsoon rainfall
- Snowmelt
- Prolonged heavy rainfall
- Position of the jet stream
- Antecedent saturated ground
- Overland flow carried excess water to the river
Human factors (2015)
- Impermeable surfaces
- Overgrazing of sheep created bare slopes and faster run off
- Mismanaging of rivers (prediction for the frequency of flooding can be incorrect)
Socio economic consequences (2015)
- 5200+ houses were flooded
- Local services were forced to close temporarily
- Impact on mental health, trauma
- Businesses were forced to close
- Damaged infrastructures
- Agricultural damage
- House price drop
- Reduced tourism due to fear of flooding
- Costs of flooding £500m
- 45 schools were affected
- Insurance claims at £325m
Environmental costs
- River banks were eroded
- Contaminated rivers with sewage
- Habitats destroyed and ecosystems affected
- Landslides caused by saturated grounds

,Henan, Eastern China - Banqiao Dam flood 1975
Meteorological factors
- Typhoon Nina- rainfall exceeded the yearly average in 1 day
Physical factors
- Antecedent rain conditions- heavy rainfall over 3 days
Human factors
- Lack of drainage at the dam and refusal to add more
- Dam had risen the water table dangerously high
Socio economic consequences
- 28,000 drowned
- 145,000 died from epidemics caused by water contamination
- Famine
- Communication lines broke down
Environmental
- 62 dams burst as a result
- Contamination of ecosystems
Management
- There was a lack of management because flood wasn’t prepared for

, Bangladesh flood 1998
Meteorological factors
- Prone to monsoon conditions
- Monsoon rain lasts over 3 months
Other factors
- Low lying delta- funnel shaped topography
- The Ganges flows down into the delta from the Himalayas which creates
orographic rainfall
- High tides and glaciers melting (snowmelt)
- All 3 major rivers reached peak discharge at the same point (Ganges,
Brahmaputra and Meghna)
Human factors
- Deforestation of Nepal
- Urbanisation
- Global warming increased glacial melt
Socio economic consequences
- 80% of the country was submerged for 3 months
- 400 factories closed
- 700,000 hectares of crops were destroyed
- 20 million were made homeless
- 1000 died
- 2.04 metric tonnes of rice crops lost
Environmental costs
- Pollution spread causing typhoid disease
- Ecosystems were destroyed
- Animals drowned
Management
- Ideas where proposed such as damming upstream to hold more excess water but
lack funds
- Reliant on international aid
- The USA donated a weather station in Bangladesh

Documentinformatie

Study Level
Subject
Geüpload op
12 juni 2023
Aantal pagina's
32
Geschreven in
2022/2023
Type
Samenvatting
$13.21

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Verkocht
0
Volgers
0
Items
4
Laatst verkocht
-



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen