NCIDQ- IDFX-Programming and Site Analysis(rated A+)2023
NCIDQ- IDFX-Programming and Site Analysis(rated A+)20231. it cannot address why people are behaving the way they are. 2. it is only valid for a period of time. it is accurate only when implemented by a skilled practitioner. - correct answer In terms of the programming process, what are three limitations of behavior observation as a technique for gathering information? 1. Client Interviews 2. Field Surveys 3. Observation 4. Questionnaires - correct answer What four methods of gathering information are used in the programming process? Multiply the area required per person by the number of people. - correct answer What is a common way to determine the floor area required for an activity? Between 60% and 80% - correct answer What range of percentages do space -planning efficiency ratios typically fall within? The actual area needed to accommodate specific functions, WITHOUT taking into account primary circulation space or support space. - correct answer What is the net area or net assignable are of a building? Area available for assignment to a tenant with in the perimeter walls of the tenant space, as we as, private corridors, walls, and columns within the tenant space. ( May also include a proportionate share of public corridors, rest rooms, and elevator lobbies shared by all tenants. - correct answer In a leased space, what is considered to be rentable area? This the area actually used for the spaces intended purpose, in addition to circulation spaces within the leased space and partitions and columns within the space. - correct answer In a leased space, what is considered to be usable area? The ratio of net area to the usable area in the leased space. - correct answer what is the efficiency factor of a leased space? Both floor area and the occupancy group must be known. - correct answer What two things must a designer know about a space before the necessary number of exits can be determined? 1. Mold 2. Mildew 3. Bacteria 4. Viruses 5. Mites 6. Pollen 7. Animal Dander 8. Dust 9. Insects - correct answer What are nine common biological contaminants found in buildings? 1. Asbetoes 2. Vermiculite 3. PCBS ( Polychlorinated Biphenyls)
Document information
- Uploaded on
- May 29, 2023
- Number of pages
- 5
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers