NCIDQ question correctly answered rated A+ already passed 2023
NCIDQ question correctly answered rated A+ already passed 2023Life Cycle Cost - correct answer The cost of the project, including the combined cost of • Construction • Operation • Maintenance of the project throughout its life cycle Project Cost - correct answer Significantly affected by the project extent, and includes Cost of preliminary studies • Site cost • Project design cost • Cost for obtaining permits and approvals for the project • Cost of construction • Cost of furniture, fixtures, and equipment • Relocation cost Owner Team - correct answer Establishes the project requirements, budget, and time constraints for the project. -significant input on equipment and finish selections and may require information on product operation, maintenance, and warranties. Some owners establish material and product standards for their projects Owner Team may consist of • Owner • Facility Manager • Facility Maintenance Engineer • Construction Manager • Tenant • Facility User standards for their projects - correct answer Standardizing products helps limit the replacement materials needed for ongoing maintenance and provides consistency in performance by minimizing the types of maintenance training necessary owner - correct answer may be an individual or an entity, may be from the private sector or public sector. The owner initiates the project and secures funding for the design, construction, and subsequent operation of the completed facility. Design Team - correct answer Works with the owner to determine the design requirements, design the project, produce the construction documents, and administer the construction contract. responsible for addressing planning issues, product research and selection, code research and compliance, quality control and assurance reviews, and construction contract administration may be contractually responsible to the owner or a design‐builder, depending on the project delivery method Design Team may consist of • Architect / Engineer (A/E) • Interior Designer • Specifier • Construction Contract Administrator
Written for
- Institution
- NCIDQ
- Course
- NCIDQ
Document information
- Uploaded on
- May 13, 2023
- Number of pages
- 6
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ncidq question correctly answered rated a already passed 2023
-
life cycle cost the cost of the project
-
including the combined cost of • construction • operation • maintenance of the project througho
Also available in package deal