MGMT 404 Felix_Lopez_Getta_Byte_Software_project_Final/MGMT404 Week 8: Course Project Part 4 (GRADED A) | UPDATED 2023
Contents 1. Introduction 3 1.1 Project goals and objectives 3 1.2 Management of the project 4 1.3 Internal and external factors that may affect the processes and procedure of the project 5 1.4 Project Charter 6-9 2 Stakeholder Engagement Plan 10-11 3 Communication management plan 11-12 4 Project Scope Statement 13-16 5 WBS And the Project Schedule 17 5.1 WBS 18 5.2 Project scheduling 19 Getta Byte Software project 5.3 Gantt Chart 20 6 Resource Allocation and Budget Reports 21 7 Error: Reference source not found 8 Error: Reference source not found 1. Introduction 1.1 Project goals and objectives The Getta Byte Software project is a mission that is formed with the main goal in mind of substituting the on-going manual online-based billing system that will enable a concise, easy, and fast data entry system. It is worth noting that the existing system has the capability of helping the company to carry out the duties in daily operations. This is quite fine, but there are a few challenges that call for an online system. The first concern is that the existing system is manual and, therefore, time-consuming and very inaccurate. A lot of time is needed in entering the information into the system, and the result is the inconsistency of the data entered and, therefore, putting the company at risk. The solution to this problem is to come up with an automated system that shall be very fast and produce accurate data. The system shall be base on the online operation, which will enhance an easy way of entering the data, conceive a dynamic update towards the receivabl
Written for
- Institution
-
Devry University
- Module
-
MGMT 404
Document information
- Uploaded on
- April 17, 2023
- Number of pages
- 18
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Unknown
Subjects
- mgmt 404
-
felixlopezgettabytesoftwareprojectfinal
-
mgmt404 week 8 course project part 4
Also available in package deal