Bicsi RTPM 002 section 1 Site Survey QUESTIONS WITH COMPLETE SOLUTIONS
Pathway Considerations correct answer: In planning for OSP cabling, cable infrastructure must be determined irst. The choices are underground, direct-buried, and aerial. Underground plant correct answer: most expensive system, has the highest cable placement capacity, longest projected lifespan, typically in excess of 50 years. Highest initial cost Direct-buried plant correct answer: A lifespan of 30 years or shorter, depending on different conditions Aerial plant correct answer: Aerial plant typically has an expected life of about 30 years Route approval correct answer: OSP designer should discuss routing with the customer. The customer may have reasons not to use the proposed route (e.g., future plans for buildings and parking lots) Force route changes correct answer: field conditions may force route changes: • Adverse ground conditions • Coordination with other utilities • Missing easement or permits • Customer space utilization issues • Document errors or omissions • Unusual or special land use or activities in close proximity to the route
École, étude et sujet
- Établissement
-
Liberty University
- Cours
-
RTPM
Infos sur le Document
- Publié le
- 28 janvier 2023
- Nombre de pages
- 3
- Écrit en
- 2022/2023
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
bicsi rtpm 002 section 1 site survey questions with complete solutions
Document également disponible en groupe