BUS 375 EXAM 2 PART A QUESTIONS WITH COMPLETE SOLUTIONS 100% POINTS
Most of the scheduling methods available today require the project manager to classify the project as either _______ constrained or ______ constrained. Selected Answer: e. Time, resource Correct Answer: e. Time, resource Question 2 4 out of 4 points In reviewing the status of her project with top management, Shirley was told that there are only two programmers that she can use for her project. Her project is classified as __________ constrained. Selected Answer: e. Resour ce Correct Answer: e. Resour ce Question 3 4 out of 4 points Gene is trying to order the concrete needed to continue his project. However, the supplier will not be able to deliver it until next week. This is an example of what kind of resource constraint? Selected Answer: e. Materi als Correct Answer: e. Materi als Question 4 4 out of 4 points Resources are adequate, but demand varies widely over the life of the project. Delaying noncritical activities to lower peak demand on resources is known as resource Selected Answer: d. Smoothi ng. This study source was downloaded by from CourseH on :05:34 GMT -06:00 BUS 375 EXAM 2 PART A QUESTIONS WITH COMPLETE SOLUTIONS 100% POINTS Correct Answer: d. Smoothi ng. Question 5 4 out of 4 points All resource leveling techniques involve Selected Answer: a. Delaying noncritical activities. Correct Answer: a. Delaying noncritical activities. Question 6 4 out of 4 points When a company will reduce the number of projects they have to manage internally to only core projects and send noncritical projects to contractors and consulting firms this is called Selected Answer: a. Outsourci ng. Correct Answer: a. Outsourci ng. Question 7 4 out of 4 points Tony has realized that two activities in his project cannot be done at the same time because not enough resources are available. Activity 3 is critical and has a duration of 5 days. Activity 4 has 2 days of slack and a duration of 2 days. How will he decide which activity should be scheduled first? Selected Answer: b. The activity with the least slack Correct Answer: b. The activity with the least slack Question 8 4 out of 4 points Which of the following is NOT a potential consequence of failing to identify limited resources before project implementation? This study source was downloaded by from CourseH
Written for
- Institution
-
Strayer University
- Course
-
BUS 375
Document information
- Uploaded on
- November 23, 2022
- Number of pages
- 7
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
bus 375 exam 2 part a questions with complete solutions 100 points