(ANSWERED) CLL 001 Life Cycle Management & Sustainment Metrics Exam 2022/2023.
CLL 001 Life Cycle Management & Sustainment Metrics Exam 1.) “Downtime” is a principal element of the Operational Availability (Ao) formula True or False 2.) The JROC identified certain KPPs and KKSAs as mandatory True or False 3.) With the establishment of the Sustainment KPP and KSAs, the LCL will have to take the time to do which three of the following 4.) A? Threshold? value for a given metric is the minimum value the customer will accept. True or False 5.) The product Support Manager (PSM), position was created to lead the development, implantation, and top-level integration and management of all sources of support to meet Warfighter requirements True or False 6.) Mean Downtime includes which of the following: 7.) LCLs are involved throughout the JCIDS process, to include the development of the JCIDS documents which contain sustainment metrics True or False 8.) Once formally established, KPPs and KSAs can become primary cost drivers True or False 9.) Changes we have been examining will require acquisition professionals to understand their role in the life cycle sustainment True or False 10.) Once your program’s Sustainment KPP and KSA requirements have been established 11.) Are KPPs and KSAs required for ACAT II programs? 12.) Which one of the following documents improve life-cycle product support by covering the PM’s responsibilities for life cycle sustainment in consideration detail? 13.) The Product Support Manager (PSM), position was created to lead the development, implementation, and top-level integration and management of all sources of support to meet Warfighting sustainment requirements True or False 14.) Mean Time to Repair (MTTR) would be possible supporting metric for which of the following KPP/KSA-level metrics? Select all that apply. 15.) KPPs and KSAs first appear in which of the following JCIDS documents? 16.) Which three of the following are decision support systems? 17.) The KPPs are included in the Initial Capabilities Document (ICD) True or False 18.) The two components of the Sustainment KPP are: 19.) The two MANDATORY Sustainment KSAs are: 20.) Operating and Support Costs include which of the following? 21.) Which of the following is NOT a potential drawback of having too many metrics? 22.) As a Life Cycle Logistician, you will be expected to perform the “M” part of the DOTMLPF-P analysis. True or False 23.) Which of the following roles in Life Cycle Product Support can be performed ONLY by a government entity? 24.) DoDI 5000.02 was revised on 7 January 2015 and now includes a milestone chart for hardware intensive systems. True or False 25.) Design for Support is manifested through design for ASOE True or False 26.) 10 USC 2337 describes the responsibilities of the PSM True or False 27.) In which phase does the LCL refine the support concept and strategy?
Document information
- Uploaded on
- October 16, 2022
- Number of pages
- 4
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers