ACI Concrete Field Testing Technician- Grade I
ACI Concrete Field Testing Technician- Grade I The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - ☑3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ☑1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - ☑Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - ☑True The temperature of concrete may be measured in a wall form. True of False - ☑True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - ☑False What must be done to the sample container prior to sampling the concrete? - ☑Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - ☑Gently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - ☑At least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - ☑Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - ☑1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? - ☑Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - ☑False The sample of concrete used for temperature determination must be rodded 25 times. True or False? - ☑False Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - ☑Compliance This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - ☑Stationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - ☑15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - ☑True The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - ☑5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - ☑15 The concrete sample must be protected from contamination and _____. - ☑Rapid evaporation The minimum size sample for making strength test specimens is _____. - ☑28 L (1ft^3) When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - ☑2
Document information
- Uploaded on
- June 28, 2022
- Number of pages
- 10
- Written in
- 2021/2022
- Type
- Other
- Person
- Unknown