100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CON 280 Block 1 Quiz, Source Selection and Administration of Service Contracts. 100% Correct Answers

Beoordeling
-
Verkocht
-
Pagina's
13
Cijfer
A
Geüpload op
27-04-2022
Geschreven in
2022/2023

CON 280 Block 1 Quiz, Source Selection and Administration of Service Contracts. 100% Correct Answers/ Course CON280_ Test CON 280 Block 1 Quiz Started Submitted Instructions Select the choice that represents the best response. There is only one correct answer per question. Question 1 2 out of 2 points The Contracting Officer for a complex services acquisition team is attending and leading his team’s initial meeting. He knows from experience and from DAU classroom training that risk identification is a critical process that will ensure a comprehensive, wellplanned acquisition. During which stage of the acquisition lifecycle must risk identification and analysis be performed? Answer Selected Answer: d. During the Review Current Strategy step of the Planning Phase of the services acquisition process, i.e. early and often - a continuous process Correct Answer: d. During the Review Current Strategy step of the Planning Phase of the services acquisition process, i.e. early and often - a continuous process Question 2 2 out of 2 points You have been assigned to an IPT that will develop the evaluation criteria and will recommend the source selection evaluation methodology for a complex, high-dollar procurement. The market research completed indicates there are a number of potentially viable technical solutions. The Government desires to keep the flexibility to accept other than the lowest priced proposal or other than the highest technically rated proposal to achieve a best-value contract award. Which method of procurement allows this flexibility? Answer Selected Answer: a. Trade-off process Correct Answer: a. Trade-off process Question 3 2 out of 2 points Your program office is formulating the strategy for an upcoming program to acquire Government-unique, operational support services for a period of up to 5 years. The total estimated contract value is approximately $12.5 million. Market research also revealed that all of the likely competitors are new technology firms who do not regularly perform under Government contracts and do not have adequate accounting systems. Given these circumstances, which contract type would you be able to award? Answer Selected Answer: c. Firm Fixed Price Correct Answer: c. Firm Fixed Price Question 4 2 out of 2 points A pre-solicitation conference will be held next month and you are preparing the synopsis to be posted on FEDBIZOPPS. A draft RFP will be posted with the synopsis with a note that conference attendees will be given a CD containing RFP attachments comprising very large, numerous technical files that could not be posted on the internet. Since the program office manages the technical files, the program manager tasked her technical specialist, John Smith, to produce the CDs for distribution at the conference. For those potential offerors or potential subcontractors who cannot attend the pre-solicitation conference but want to request the CD, which person do you identify as the point of contact in the synopsis? Answer Selected Answer: d. The Contracting Officer Correct Answer: d. The Contracting Officer Question 5 2 out of 2 points You are planning for the procurement of an advanced, engineering or operational systems development and first production. The uncertainties of performance are such that they preclude use of a firm fixed-price type of contract. However, they may not be so great as to justify use of a cost-plus-a-fixed-fee contract. In these circumstances, what contract type should be used? Answer Selected Answer: b. Cost Plus Incentive Fee Correct Answer: b. Cost Plus Incentive Fee Question 6 2 out of 2 points If the Government makes a change in the Quality Assurance Surveillance Plan, what will be the impact on the Performance Work Statement? Answer Selected Answer: a. There is no impact since the PWS drives the QASP and not vice versa. Correct Answer: a. There is no impact since the PWS drives the QASP and not vice versa. Question 7 2 out of 2 points The contracting officer has just been informed by the program office of a new $600,000 requirement for services that will be coming his way. This is the first time he has heard of this requirement. When should the contracting officer reach out to the small business specialist for advice and support? Answer Selected Answer: a. Immediately, as the small business specialist should be involved as early as possible in the acquisition process.

Meer zien Lees minder









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Documentinformatie

Geüpload op
27 april 2022
Aantal pagina's
13
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
trustedtutor001 Walden University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
139
Lid sinds
4 jaar
Aantal volgers
125
Documenten
598
Laatst verkocht
2 maanden geleden

1.8

4 beoordelingen

5
0
4
0
3
1
2
1
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen