100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

BUSN333 Quiz_2 Chapters 3&4 (A GUARANTEED) <100% C0RRECT> GRADED A+ | LATEST SOLUTIONS |

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
10-11-2021
Written in
2021/2022

BUSN333 Quiz_2 Chapters 3&4 (A GUARANTEED) &lt;100% C0RRECT&gt; GRADED A+ | LATEST SOLUTIONS | Part 1 of 2 - 50.0/ 50.0 Points Question 1 of 20 All of the following are disadvantages of organizing projects within a matrix arrangement EXCEPT A. Dysfunctional conflict between functional managers and project managers. B. Expensive. C. Infighting. D. Stressful. E. Longer project duration. Question 2 of 20 A project team that operates with a full-time project manager as a separate unit from the rest of the organization is structured using ________ organization. A. Functional B. Balanced matrix C. Weak matrix D. Strong matrix E. Projectized Question 3 of 20 Factors in identifying cultural characteristics include all the following EXCEPT A. Norms. B. Customs. C. Values. D. Attitude. E. All of these are factors in identifying cultural characteristics. Question 4 of 20 Which of the following is an advantage of a functional project management organization? A. Maximum flexibility in the use of staff Tests & Quizzes B. Good integration across functional units 2/6 5.0/ 5.0 Points 5.0/ 5.0 Points 5.0/ 5.0 Points 5.0/ 5.0 Points C. Shorter project duration D. Strong motivation of project team members E. Longer project duration Question 5 of 20 Elizabeth is considering how to structure a project team that will not directly disrupt ongoing operations. The project needs to be done quickly and a high level of motivation will be needed in order to do that. For this situation, the ______ organization would be the best choice. A. Functional B. Balanced matrix C. Weak matrix D. Strong matrix E. Projectized Question 6 of 20 Which of the following cultural characteristics relates to the degree to which groups within the organization are encouraged to operate in a coordinated or independent manner? A. Member identity B. Team emphasis C. Managerial focus D. Unit integration E. Control Question 7 of 20 Who is responsible for determining how tasks will be done in a weak matrix project management structure? A. The functional manager B. The project manager C. Both the functional manager and the project manager are responsible D. There is no rule established for who takes responsibility E. This is negotiated Question 8 of 20 The structure that manages projects within the existing organizational structure is __________ organization. A. Functional B. Balanced matrix C. Weak matrix D. Strong matrix 3/6 5.0/ 5.0 Points 5.0/ 5.0 Points 5.0/ 5.0 Points 5.0/ 5.0 Points E. Projectized Question 9 of 20 Which of the following cultural characteristics relates to the degree to which work activities are organized around groups rather than individuals? A. Member identity B. Team emphasis C. Managerial focus D. Unit integration E. Control Question 10 of 20 Which of the following cultural characteristics relates to the degree to which management focuses on outcomes rather than on techniques and processes used to achieve those outcomes? A. Risk tolerance B. Reward criteria C. Conflict tolerance D. Means versus end orientation E. Open-systems focus

Show more Read less
Institution
Phoenix College
Course
BUS









Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
November 10, 2021
Number of pages
5
Written in
2021/2022
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
examdomain Ashford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
24
Member since
5 year
Number of followers
23
Documents
194
Last sold
1 year ago
examdomain

A GUARANTEED

3.8

5 reviews

5
3
4
0
3
1
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions