GCOR Practice Test Updated Study Guide 2026 - Study Answer Collection
GCOR Practice Test Updated Study Guide 2026 - Study Answer Collection Dual Control Switch - answer - A power operated switch, movable point frog, or derail that can also be operated by hand. Electric Switch Lock - answer - An electrically controlled lock that restricts the use of a hand operated switch or derail. Absolute Signal - answer - A block or interlocking signal without a number plate or designated by an A marker. Automatic Block System (ABS) - answer - A series of consecutive blocks governed by block signals, cab signals, or both. The signals are activated by a train or by certain conditions that affect the block use. Block - answer - A length of track between consecutive block signals or between a block signal and the end of block system limits. Centralized Traffic Control (CTC) - answer - A block system that uses block signal indications to authorize train movements. Control Operator - answer - An employee assigned to operate a CTC or interlocking control machine or authorized to grant track permits. Control Point - answer - The location of absolute signals controlled by a central operator or a railroad identifiable point as defined in the Timetable. Controlled Siding - answer - A siding within CTC and Interlocking limits where a signal indication authorizes the siding's use. Controlled Signal - answer - An absolute signal controlled by a control operator. Controlled Track - answer - Track upon which the railroad's operating rules require that all movements of trains must be authorized by a train dispatcher or a control operator. Crossover - answer - A combination of two switches that connect two adjacent tracks. Interlocking Signals - answer - The fixed signals of an interlocking that govern trains using interlocking limits. Loaded Bulk Commodity Train - answer - Loaded Unit Trains are defined as a train of 50 or more loaded cars in a block, each weighing 125 tons gross weight or more (bulk commodities), such as coal, grain, soda ash, etc. Main Track - answer - A track extending through yards and between stations that must be occupied without authority or protection. Non-Controlled Track - answer - Track upon which trains are permitted by railroad rule or special instruction to move without recieving authorization from train dispatcher or control operator. Off-Track Equipment - answer - Machines that may be operated on the right of way foul of track. Proceed Indication - answer - Any block signal indication that allows a train to proceed without stopping. Reverse Movement - answer - A movement opposite the authorized direction. Siding - answer - A track connected to the main track and used for meeting or passing trains. Locations of sidings are shown int he Timetable. Special Instructions - answer - Instructions contained in the Timetable or other publications. Station - answer - A place designated by name in the Timetable station column. Track Bulletin - answer - A notice of coinditions affecting train movement. It may also authorize movement against the current of traffic where rule 9.14 (movement witht he Current of Traffic) is in effect. Track Car - answer - Any equipment which is designed to operate on the rail, other than a Locomotive or railroad car. Track Warrant Control (TWC) - answer - A method to authorize train movements or protect man or machines on a main track within specified limits in a territory designated by the timeline. Train - answer - One or more engines coupled, with or without cars, displaying a marker, and authorized to operate ont he main track. Yard Limit - answer - A portion of main track designated by yard limit signs and time table special instructions or a track bulletin. Any employee operating a radio must do the following - answer - Before transmitting, listen long enough to make sure the channel is not being used. Give the required identification. Not proceed with further transmission until acknowledgement is received. For Mobile Units - answer - Name o
Documentinformatie
- Geüpload op
- 20 november 2026
- Aantal pagina's
- 14
- Geschreven in
- 2026/2027
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden