• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

NERC RC Exam Study Material - Fully Updated Solutions

Document preview thumbnail
Preview 3 out of 16 pages

NERC RC Exam Study Material - Fully Updated Solutions What is ACE? - answer - (NIa - NIs) - 10β(fa - fs) - Ime Calculated every 6 seconds Uses Tie line Frequency Bias What is Tie line deviation? - answer - Largest offset to ACE What is NIA? - answer - Net Interchange Actual (sum of all tie-line values) What is NIS? - answer - Net Interchange Scheduled (sum of all interchange schedules) What is the multiplier for frequency bias? - answer - 10 What is β? - answer - Frequency bias - represented as negative number in ACE calculation - reflects area natural response to frequency changes (Inertia, Governor, Load) - atleast 1% of annual peak load for areas with native load - 1% of peak generation output for area with no load What is FA? - answer - Frequency Actual What is FS? - answer - Frequency Schedule - normally 60.00 HZ except for time corrections - +/- .02 Hz What is IME? - answer - Meter error fudge factor used for inadvertent bilateral payback Negligible What should be done if unable to calculate ACE for 30 minutes? - answer - Contact RC How often should time error and frequency devices be checked/calibrated? - answer - Annually Negative Ace - answer - The BA is Undergenerating Positve ACE - answer - The BA is Overgenerating What happens during Internal Loss of Load? - answer - Frequency and ACE increase. What happens during External Loss of Load? - answer - Frequency increases, no change in ACE. What is the Frequency Bias Setting? - answer - Monthly average = 1% of estimated yearly peak demand per 0.1 Hz When should the Balancing Authority recalculate its Frequency Bias Setting? - answer - By January 1 of each year What happens when there is internal generation loss? - answer - Frequency and ACE drop, tie-line flows increase into the system What happens when there is external generation loss? - answer - Frequency drops, no change in ACE, net tie-line flows increase out of the system What happens when Frequency bias setting is lower than frequency response? - answer - ACE will be positive causing the AGC to lower generation What is the percentage change in load required for a 1% change in frequency? - answer - 1% - 2% change in load What is the load reduction when Transmission Customer Voltage is reduced by 5%? - answer - Load will reduce by 3% What happens to ACE and AGC when the frequency bias setting is set to a less negative value than the frequency response of a Balancing Authority and a frequency increase is caused by a sudden loss of load in an external balancing area? - answer - ACE will be a negative value and AGC will increase generation What happens to ACE and AGC when the frequency bias setting is less negative than the frequency response of a Balancing Authority and a frequency decline is caused by a sudden loss of generation in an external balancing area? - answer - ACE will be a positive value and AGC will lower generation What is the normal schedule frequency? - answer - 60.00 Hz What is the frequency correction for fast clock schedule? - answer - 59.98 Hz What is the frequency corrections for a slow clock schedule? - answer - 60.02 Hz When does frequency increase? - answer - Generation increases or load decreases When does frequency decrease? - answer - Generation decreases or load increases Who is the Time Monitor? - answer - Can only be RC one per Interconnection Who is designated as Interconnection Time Monitor? - answer - Single RC designated by NERC Operating Committee When can a time error correction be cancelled? - answer - with 30% BAs in area requests What is the minimum duration for time error correction? - answer - 1 hour When does time error correction start? - answer - On the hour or half-hour What are the standards for time error correction? - answer - NAESB standards (North American Energy Standards Board) Who can request a termination? - answer - Any Reliability Coordinator What is the notification time to start or stop a time error schedule? - answer - 60


Document information

Uploaded on
November 9, 2026
Number of pages
16
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SARAHnkalu
4.6
(7)
Sold
50
Followers
0
Items
9183
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.