3M 304 DIVO VERIFIED STUDY GUIDE
Navseainst 4790.8c - answers - 3m manual
Opnavinst 5100.23g (with change-1) - answers - navy safety and occupational health
(soh) program manual
Nstm 300 - answers - electrical regulations and safety
5100.2 - answers - tag-out and lockout energized work program
Nctssdinst 4110.1d - answers - hazardous material control and management
program
Nctssdinst 5100.23a - answers - fall protection program
Speterl - answers - ship shore portable electronic test equipment requirements list
Comnaviforinst 4790.1 - answers - shore 3m program
Nctamspac 4790.1 and 4790.2 - answers - isic 3m instruction
Navcomtelstasdiego inst 4790.1g - answers - local command 3m instruction
Overall responsible for 3m program at command - answers - co
3m system manager - answers - xo
Functional manager of 3m system - answers - 3mc
Required to do weekly closeouts - answers - lcpo/divo
Review csmp 2x weekly - answers - lcpo/divo
Make sure equipment validations are correct and updated in awn - answers -
lcpo/divo
2nd person on all maint actions recorded in awn - answers - lcpo
Lcpo provides divo weekly status of - answers - 1. 3m self assessment program, 2.
Current ships maintenance project (csmp) 3. Pms accomplishment and non
accomplishment
Reviews initials line outs on work center loep and mips - answers - lcpo
Reviews and submits required 3m docs to divo - answers - lcpo
Navseainst 4790.8c - answers - 3m manual
Opnavinst 5100.23g (with change-1) - answers - navy safety and occupational health
(soh) program manual
Nstm 300 - answers - electrical regulations and safety
5100.2 - answers - tag-out and lockout energized work program
Nctssdinst 4110.1d - answers - hazardous material control and management
program
Nctssdinst 5100.23a - answers - fall protection program
Speterl - answers - ship shore portable electronic test equipment requirements list
Comnaviforinst 4790.1 - answers - shore 3m program
Nctamspac 4790.1 and 4790.2 - answers - isic 3m instruction
Navcomtelstasdiego inst 4790.1g - answers - local command 3m instruction
Overall responsible for 3m program at command - answers - co
3m system manager - answers - xo
Functional manager of 3m system - answers - 3mc
Required to do weekly closeouts - answers - lcpo/divo
Review csmp 2x weekly - answers - lcpo/divo
Make sure equipment validations are correct and updated in awn - answers -
lcpo/divo
2nd person on all maint actions recorded in awn - answers - lcpo
Lcpo provides divo weekly status of - answers - 1. 3m self assessment program, 2.
Current ships maintenance project (csmp) 3. Pms accomplishment and non
accomplishment
Reviews initials line outs on work center loep and mips - answers - lcpo
Reviews and submits required 3m docs to divo - answers - lcpo