• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 33 pages
Exam (elaborations)

Agile Safe 5.1 Key Concepts And Revision Notes

Document preview thumbnail
Preview 4 out of 33 pages

Agile Safe 5.1 Key Concepts And Revision Notes

Content preview

AGILE SAFE 5.1 KEY CONCEPTS AND
REVISION NOTES

◉ Apply Systems Thinking
Answer: Lean-Agile Prin. ATTRIBUTES: * Optimizing a component
does not optimize the system; * a higher-level of understanding &
Arch is required; *System value passed through its
interconnections; * System can evolve no faster than its slowest
integration point.


◉ Optimize Full Value Stream
Answer: Lean-Agile Prin., Systems Thinking. * Reducing Delays in
Value Stream is fastest way to reduce time to market.


◉ Assume Variability; preserve options
Answer: Lean-Agile Prin. *Requirements must be flexible to make
economic designs choices. *Design must be flexible to support
changing requirements. *Preservation of options improves
economic options.. Apply a set-based approach.


◉ Build incrementally with fast, integrated learning cycles
Answer: Lean-Agile Prin. * Apply fast learning cycles - shorter the
cycle, faster the learning. PDCA (Plan, Do, Check, Adjust).
Facilitated by small batch cycles. * Apply fast learning cycles.
Integration points control product development. Dev proceeds no

,faster than the slowest learning loop. *Integration points reduce
risk.


◉ Base milestones on objective evaluation of working systems
Answer: Lean-Agile Prin. 1. Apply Objective Milestones: PI system
demos are orchestrated to deliver objective progress, product, and
process Metrics. 2. Iterate to optimum solution (Objective
Milestones). *Problems with Phase-gate milestones: early design
decisions, assume solution can be built correctly first time, create
huge batches and long queues. *Requirements & decisions too
early, adjustments too late & costly as new facts emerge.


◉ Visualize and limit WIP, reduce batch sizes, manage Q lengths
Answer: Lean-Agile Prin. *Reduce batch sizes for higher
predictability, accelerated feedback, - less rework, lower cost.
Most important is Handoff Batch. *Find optimal batch size. Higher
Transaction costs make optimal batch size bigger; Higher holding
costs make it smaller (crossed lines in a chart).


◉ BVIR
Answer: Big Visible Info Radiator (Kanban board). Features,
Stories, Dependencies, Milestones.


◉ Little's Law
Answer: Faster processing time decreases wait; shorter q lengths
decrease wait. Average Wait time = Average q length / average

,processing wait. Wq = Lq/Lambda. e.g. 30 items/10 items/Q =
3Quarters


◉ Apply cadence, sync with x-domain planning
Answer: Lean-Agile Prin. *Cadence: predictable occurrences,
predictable waiting time, regular planning & x-fcnl cordn, limits
batch size, controls injection of new work, scheduled integration
pts. Need scope/capacity margin. Cadence-based planning limits
variability to single interval. * Synchronization (demos): multiple
concurrent events, x-functional tradeoffs, routine dependency
mgt, full system & integration assessment, multiple feedback
perspectives. Design cycles must be synchronized. Sync w x-
domain planning.


◉ Unlock the intrinsic motivation of knowledge workers
Answer: Lean-Agile Prin. Knowledge workers most qualified to
make decisions about their work. Need autonomy. Autonomy,
Mastery, Purpose.


◉ Decentralize decision-making
Answer: Lean-Agile Prin. Define the economic logic behind a
decision; empower others to make the changes. Centralize:
Infrequent, Long-lasting, Significant economies of scale.
Decentralize Frequent, Time critical, Require local information.


◉ Organize around value

, Answer: Lean-Agile Prin. *Value doesn't follow silos. * Organize
around flow of value (Value Stream). *Value at scale is distributed
- often flows across org boundaries. *Find the kidney - value
stream within which to build 1+ ARTs.


◉ Value Stream
Answer: Sequence of steps used to deliver a continuous value to
Customer. Includes whole sequence to value delivery, Contains
people, systems, flow of info & materials.


◉ ART
Answer: Agile Release Train. Long-lived team of Agile Teams.
Virtual org of 5-12 Teams (50-125+ indivds). Syncd on common
cadence, PI. Aligned to common mission vis single PROGRAM
backlog. CE, CI, CD, ROD. Create x-fcnl ARTs.


◉ BV
Answer: Business Value


◉ BO
Answer: Business Owner. Key stakeholders on the ART.


◉ CapEx
Answer: Capital Expenditures, how much the firm spends on fixed
assets.

Document information

Uploaded on
October 25, 2026
Number of pages
33
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$18.00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
4.0
(30)
Sold
315
Followers
5
Items
78365
Last sold
7 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions