SAP TS410 COMPREHENSIVE EXAM STUDY
GUIDE WITH COMPLETE SOLUTIONS
●● What is the purpose of Material Ledger?
Answer: -the elimination of locking and increase throughput for standard
pricing for material valuation
-improved and flexible valuation methods in multiple currencies and
parallel accounting
●● What is the output of an MRP run?
Answer: -Planned Order
-Purchase Req for Dependent Requirements
-Reservation for Dependent Items
●● What is the master data need for Adv. Planning?
Answer: - Location
- Product
- Resource
●● List the Options for Running MRP?
Answer: - Total Planning
- Single Item Planning Multilevel
,- Single Item Planning Single Level
- Single Item Planning Interactive
●● What is the difference between the stock requirements list and the
MRP list?
Answer: Stock Req - Real Time / Dynamic
MRP List - Static / Frozen
●● What is the difference between MRP and Consumption Based
Planning?
Answer: MRP - planned on requirements (future, current, forecast)
CBP - planning on historical data (historical)
●● What does a work center control?
Answer: Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types
●● What is the result of a completion confirmation?
,Answer: - Progress of the order / status update
- GR partial or final
- Time Activity Update
- Scrap leftover material
●● What happens, on the Stock Requirements List, when a planned
order is converted to a production order for the finished product:
Answer: - planned order converts to production order
- BOM + routing is copied from planned order to production order
●● What happens, on the Stock Requirements List, when a planned
order is converted to a production order for the components:
Answer: - reservations for dependent components
●● What is a standard cost estimate used for?
Answer: -Determine the sales price
- Update the standard price in material master
- Calculate the planned cost in a production order
●● What is a work center?
Answer: - type of time (days, hours)
- where
- who
, - identifies the resources
- formula calculations
●● Describe each of the different types of goods movements.
Answer: - GR
- GI
- Stock Transfer / Transfer Posting
●● What is a routing?
Answer: Sequence of steps to complete the work
Quantity of time to complete the work
●● What transactions debit a production order?
Answer: GI
Confirmation
External Processing
Overhead
Direct FI Postings
●● What transactions credit a production order?
Answer: GR
Settlement
GUIDE WITH COMPLETE SOLUTIONS
●● What is the purpose of Material Ledger?
Answer: -the elimination of locking and increase throughput for standard
pricing for material valuation
-improved and flexible valuation methods in multiple currencies and
parallel accounting
●● What is the output of an MRP run?
Answer: -Planned Order
-Purchase Req for Dependent Requirements
-Reservation for Dependent Items
●● What is the master data need for Adv. Planning?
Answer: - Location
- Product
- Resource
●● List the Options for Running MRP?
Answer: - Total Planning
- Single Item Planning Multilevel
,- Single Item Planning Single Level
- Single Item Planning Interactive
●● What is the difference between the stock requirements list and the
MRP list?
Answer: Stock Req - Real Time / Dynamic
MRP List - Static / Frozen
●● What is the difference between MRP and Consumption Based
Planning?
Answer: MRP - planned on requirements (future, current, forecast)
CBP - planning on historical data (historical)
●● What does a work center control?
Answer: Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types
●● What is the result of a completion confirmation?
,Answer: - Progress of the order / status update
- GR partial or final
- Time Activity Update
- Scrap leftover material
●● What happens, on the Stock Requirements List, when a planned
order is converted to a production order for the finished product:
Answer: - planned order converts to production order
- BOM + routing is copied from planned order to production order
●● What happens, on the Stock Requirements List, when a planned
order is converted to a production order for the components:
Answer: - reservations for dependent components
●● What is a standard cost estimate used for?
Answer: -Determine the sales price
- Update the standard price in material master
- Calculate the planned cost in a production order
●● What is a work center?
Answer: - type of time (days, hours)
- where
- who
, - identifies the resources
- formula calculations
●● Describe each of the different types of goods movements.
Answer: - GR
- GI
- Stock Transfer / Transfer Posting
●● What is a routing?
Answer: Sequence of steps to complete the work
Quantity of time to complete the work
●● What transactions debit a production order?
Answer: GI
Confirmation
External Processing
Overhead
Direct FI Postings
●● What transactions credit a production order?
Answer: GR
Settlement