• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 51 pages
Exam (elaborations)

Sap Ts410 Comprehensive Exam Study Guide With Complete Solutions

Document preview thumbnail
Preview 4 out of 51 pages

Sap Ts410 Comprehensive Exam Study Guide With Complete Solutions

Content preview

SAP TS410 COMPREHENSIVE EXAM STUDY
GUIDE WITH COMPLETE SOLUTIONS

●● What is the purpose of Material Ledger?
Answer: -the elimination of locking and increase throughput for standard
pricing for material valuation
-improved and flexible valuation methods in multiple currencies and
parallel accounting


●● What is the output of an MRP run?
Answer: -Planned Order
-Purchase Req for Dependent Requirements
-Reservation for Dependent Items


●● What is the master data need for Adv. Planning?
Answer: - Location
- Product
- Resource


●● List the Options for Running MRP?
Answer: - Total Planning
- Single Item Planning Multilevel

,- Single Item Planning Single Level
- Single Item Planning Interactive


●● What is the difference between the stock requirements list and the
MRP list?
Answer: Stock Req - Real Time / Dynamic
MRP List - Static / Frozen


●● What is the difference between MRP and Consumption Based
Planning?
Answer: MRP - planned on requirements (future, current, forecast)
CBP - planning on historical data (historical)


●● What does a work center control?
Answer: Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types


●● What is the result of a completion confirmation?

,Answer: - Progress of the order / status update
- GR partial or final
- Time Activity Update
- Scrap leftover material


●● What happens, on the Stock Requirements List, when a planned
order is converted to a production order for the finished product:
Answer: - planned order converts to production order
- BOM + routing is copied from planned order to production order


●● What happens, on the Stock Requirements List, when a planned
order is converted to a production order for the components:
Answer: - reservations for dependent components


●● What is a standard cost estimate used for?
Answer: -Determine the sales price
- Update the standard price in material master
- Calculate the planned cost in a production order


●● What is a work center?
Answer: - type of time (days, hours)
- where
- who

, - identifies the resources
- formula calculations


●● Describe each of the different types of goods movements.
Answer: - GR
- GI
- Stock Transfer / Transfer Posting


●● What is a routing?
Answer: Sequence of steps to complete the work
Quantity of time to complete the work


●● What transactions debit a production order?
Answer: GI
Confirmation
External Processing
Overhead
Direct FI Postings


●● What transactions credit a production order?
Answer: GR
Settlement

Document information

Uploaded on
October 25, 2026
Number of pages
51
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
36
Followers
1
Items
24252
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions