FLORIDA FIRE INSPECTOR STATE TEST Questions with Correct
Solutions
Question:
1. Lumber can be stacked ___ ft high
Answer:
20
Question:
2. Fire retardant wood
Answer:
impregnation and surface coating
Question:
3. complaints that arnt serious can be assigned to
Answer:
inspection staff
Question:
4. fire extinguishers - 40lbs or less mounted 5 ft from ground - greater than 40lbs mounted 3
1/2 ft from ground
Answer:
clearance of 4" from ground
Question:
5. fire alarm control unit _____ monitor the wiring of the system
Answer:
electronics
Question:
6. proprietary system - large commercial, group of commonly owned facilities
Answer:
tested annually / extensive repair or modification
Question:
7. evacution phases: Phase 1
Answer:
single room
, Question:
8. evacuation phases: Phase 2
Answer:
entire zone
Question:
9. evacuation phases: Phase 3
Answer:
entire floor then floor above
Question:
10. evacuation phase: phase 4
Answer:
entire building
Question:
11. engineered wood products
Answer:
use panels, adhesives and metal fasteners
Question:
12. nursing home is classified as
Answer:
group b division 2
Question:
13. fire lane -
Answer:
150 ft long with clearance of 13'6"
Question:
14. fire lane markings
Answer:
curbs painted red with white lettering, street painted white with red lettering
Question:
15. field verification
Solutions
Question:
1. Lumber can be stacked ___ ft high
Answer:
20
Question:
2. Fire retardant wood
Answer:
impregnation and surface coating
Question:
3. complaints that arnt serious can be assigned to
Answer:
inspection staff
Question:
4. fire extinguishers - 40lbs or less mounted 5 ft from ground - greater than 40lbs mounted 3
1/2 ft from ground
Answer:
clearance of 4" from ground
Question:
5. fire alarm control unit _____ monitor the wiring of the system
Answer:
electronics
Question:
6. proprietary system - large commercial, group of commonly owned facilities
Answer:
tested annually / extensive repair or modification
Question:
7. evacution phases: Phase 1
Answer:
single room
, Question:
8. evacuation phases: Phase 2
Answer:
entire zone
Question:
9. evacuation phases: Phase 3
Answer:
entire floor then floor above
Question:
10. evacuation phase: phase 4
Answer:
entire building
Question:
11. engineered wood products
Answer:
use panels, adhesives and metal fasteners
Question:
12. nursing home is classified as
Answer:
group b division 2
Question:
13. fire lane -
Answer:
150 ft long with clearance of 13'6"
Question:
14. fire lane markings
Answer:
curbs painted red with white lettering, street painted white with red lettering
Question:
15. field verification