Exam Newest 2026/ 2027 Test Bank| Electrical
Contractor Licence Exam Prep With Complete 300 Real
Exam Questions And Correct Verified Answers/ Already
Graded A+ (Most Recent!!)
SECTION 1: NEVADA CONTRACTOR LICENSING LAW & BUSINESS MANAGEMENT
1. Under NAC 624.200, the C-2 electrical contractor license authorizes work in
which of the following areas?
A) Plumbing and heating systems only
B) Installation and modification of electrical wires, fixtures, and raceways
C) Structural carpentry and framing
D) Painting and wall finishing
Answer: B
Rationale: NAC 624.200 defines the C-2 classification as electrical contracting,
encompassing electrical wires, fixtures, appliances, apparatuses, raceways, and conduits.
2. A contractor discovers a significant clerical error in a submitted bid that would
result in a $25,000 underestimation. What is the most appropriate FIRST course of
action?
A) Withdraw the bid without notifying the project owner
B) Immediately notify the project owner in writing of the error
C) Plan to recover the loss through future change orders
D) Refuse to sign the contract if awarded
Answer: B
Rationale: Prompt written notification preserves the contractor’s legal standing and
demonstrates good faith under contract law.
3. The Nevada State Contractors Board requires applicants to have at least how
many years of experience within the last 10 years?
A) 2 years
B) 3 years
C) 4 years
,D) 5 years
Answer: C
Rationale: Applicants must have at least 4 years of experience within the last 10 years in
the designation applied for.
4. Which entity administers the Nevada C-2 contractor licensing examinations?
A) The Nevada State Contractors Board directly
B) PSI Licensure: Certification
C) The local building department
D) The National Electrical Contractors Association
Answer: B
Rationale: PSI administers the contractor licensing examinations for Nevada.
5. The Nevada C-2 trade examination consists of how many questions?
A) 50
B) 80
C) 100
D) 120
Answer: B
Rationale: The current C-2 trade examination bulletin lists 80 questions.
6. What is the minimum passing score for the Nevada C-2 trade examination?
A) 50 correct (62.5%)
B) 56 correct (70%)
C) 60 correct (75%)
D) 64 correct (80%)
Answer: B
Rationale: A minimum of 56 questions (70%) must be correct to pass.
7. How much time is allowed to complete the Nevada C-2 trade examination?
A) 2 hours
B) 3 hours
C) 4 hours
D) 5 hours
Answer: C
Rationale: The exam has a 4-hour time limit.
,8. Which reference materials are allowed into the Nevada C-2 examination room?
A) Any electrical textbook
B) Only the National Electrical Code and NFPA 72
C) Only the NEC Handbook
D) All reference materials used to create the exam
Answer: B
Rationale: Only the NEC and NFPA 72 are allowed into the exam.
9. A surety bond is required for a Nevada C-2 contractor license. What is the
minimum bond amount?
A) $500
B) $1,000
C) $5,000
D) $10,000
Answer: B
Rationale: The minimum bond amount is $1,000 and the maximum is $500,000.
10. A Nevada contractor license is issued for how long before renewal is required?
A) 1 year
B) 2 years
C) 3 years
D) 4 years
Answer: B
Rationale: A license is issued for 2 years and must be renewed biennially.
11. Does the State of Nevada require continuing education for the C-2 electrical
contractor license?
A) Yes, 16 hours annually
B) Yes, 8 hours biennially
C) No, continuing education is not currently required for this license
D) Yes, only for residential work
Answer: C
Rationale: Nevada currently does not require continuing education for this license.
12. The C-2 license belongs to whom?
A) The qualifying party personally
B) The business entity
, C) The State of Nevada
D) The surety bond company
Answer: B
Rationale: The license belongs to the business, not the qualifying party.
13. The Nevada C-2 license allows work in all of the following subclassifications
EXCEPT:
A) Fire Detection (C-2c)
B) Low Voltage (C-2d)
C) Residential Wiring (C-2f)
D) Plumbing and Heating (C-2h)
Answer: D
Rationale: The C-2 subclassifications include Electrical Wiring, Integrated Ceilings, Fire
Detection, Low Voltage, Lines to Transmit Electricity, Residential Wiring, and
Photovoltaics.
14. Pre-approval by the licensing board is required before an applicant may:
A) Purchase electrical materials
B) Sit for the examination
C) Hire employees
D) Advertise services
Answer: B
Rationale: Pre-approval is required to sit for the exam; applicants must submit an
application to the licensing board.
15. The application fee for a Nevada contractor license is:
A) $100
B) $300
C) $600
D) $1,000
Answer: B
Rationale: The fee to apply is $300.
16. If a license is approved, the biennial license fee is:
A) $300
B) $600
C) $900