WALMART STORMWATER FREQUENTLY TESTED
ACTUAL EXAM QUESTIONS WITH CORRECT ANSWERS
Question 1.
The 1970's law that set into place the regulation of stormwater is:
ANSWER
The Clean Water Act
Question 2.
Requirements for managing stormwater activity on a construction site are outlined in the following
regulation:
ANSWER
NPDES
Question 3.
Which of the following is never an allowable stormwater discharge from a construction site?
ANSWER
Discharge from contaminated groundwater
Question 4.
The Notice of termination can filed when:
ANSWER
All construction activity, inside and outside the building, is complete and permanent
stabilization verified
Question 5.
Relative to stormwater permitting, all of the following must occur before construction starts except:
ANSWER
Submit the notice of termination (NOT)
1/5
, Question 6.
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy and
slows overland flow of stormwater
ANSWER
Vegetation
Question 7.
Of the following factors that influence erosion rates, the one a contractor has the most control over is:
ANSWER
Groundcover
Question 8.
Temporary stabilization should be implemented
ANSWER
Immediately on all disturbed areas that are likely to or will remain inactive for 14-days or more
Question 9.
The Primary purpose of a construction exit is
ANSWER
To remove sediment from construction site vehicles and minimize trackout
Question 10.
Common types of erosion include all of the following except
ANSWER
Sedimentation
Question 11.
Which of the following is NOT a beneficial use of water?
ANSWER
Flushing a spill down a storm drain
2/5
ACTUAL EXAM QUESTIONS WITH CORRECT ANSWERS
Question 1.
The 1970's law that set into place the regulation of stormwater is:
ANSWER
The Clean Water Act
Question 2.
Requirements for managing stormwater activity on a construction site are outlined in the following
regulation:
ANSWER
NPDES
Question 3.
Which of the following is never an allowable stormwater discharge from a construction site?
ANSWER
Discharge from contaminated groundwater
Question 4.
The Notice of termination can filed when:
ANSWER
All construction activity, inside and outside the building, is complete and permanent
stabilization verified
Question 5.
Relative to stormwater permitting, all of the following must occur before construction starts except:
ANSWER
Submit the notice of termination (NOT)
1/5
, Question 6.
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy and
slows overland flow of stormwater
ANSWER
Vegetation
Question 7.
Of the following factors that influence erosion rates, the one a contractor has the most control over is:
ANSWER
Groundcover
Question 8.
Temporary stabilization should be implemented
ANSWER
Immediately on all disturbed areas that are likely to or will remain inactive for 14-days or more
Question 9.
The Primary purpose of a construction exit is
ANSWER
To remove sediment from construction site vehicles and minimize trackout
Question 10.
Common types of erosion include all of the following except
ANSWER
Sedimentation
Question 11.
Which of the following is NOT a beneficial use of water?
ANSWER
Flushing a spill down a storm drain
2/5