Content preview

FINAL EXAM ELEVATOR



wrench used for rail installation - CORRECT ANSWER-spud wrench


The minimum clearance form the floor to the suspended ceiling is:
a. 80"
b. 96"
c. 7'3"
d. 8'2" - CORRECT ANSWER-a. 80"


what should you be aware of when removing a cab for replacement?
a. The weight that is to be removed from the ceiling.
b. The original weight and counterbalancing.
c. How much the cab was out of square.
d. Cover the panels so they do not get banged up. - CORRECT ANSWER-b. The
original weight and counterbalancing.


When fans are used on modernization jobs for exhausting fumes, what
statement is correct?
a. They're to keep you cool, not for exhausting fumes.
b. They should direct the fumes into the hoistway.
c. They should direct the fumes into the pit.
d. They should direct the fumes to the outside. - CORRECT ANSWER-d. They
should direct the fumes to the outside.


The star symbol is used on the COP for what?

,a. To show where the floor buttons are located.
b. To designate the main floor.
c. To make the door buttons stand out.
d. To show the alarm bell location. - CORRECT ANSWER-b. To designate the
main floor.


Using a laminate stop strip against the fence on a table saw:
a. Keeps the laminate straight to the blade.
b. Keeps the laminate from lifting off the blade.
c. Keeps the laminate from slipping under the fence.
d. Keeps the laminate from going over the fence. - CORRECT ANSWER-c. Keeps
the laminate from slipping under the fence.


The contact adhesives must be ________ before final bonding:
a. 85 degrees
b. Dry
c. Wet to touch
d. Cold - CORRECT ANSWER-b. Dry


What is the most important piece of equipment you have when using a power
saw?
a. Combination blade
b. Safety glasses
c. Wood rule
d. Framing square - CORRECT ANSWER-b. safety glasses


When using a circular saw, which of the following is correct?

,a. Never start the cut until the blade is turning full RPM
b. The base is not adjustable for cutting depth
c. Circular saw blades range from 10 to 16 inches
d. Remove the retractable guard before cutting - CORRECT ANSWER-a. Never
start the cut until the blade is turning full RPM


What is used to make crosscuts on a table saw?
a. Push stick
b. Rip fence
c. Miter gauge
d. Larger Blade - CORRECT ANSWER-c. Miter saw


When making crosscuts with a radial arm saw which statement is correct?
a. Push the wood slowly into the blade.
b. Restrain the blade from moving too fast.
c. Rotate and lock the blade parallel to the guide.
d. Adjust the blade 1/4" above to cutting surface - CORRECT ANSWER-b.
Restrain the blade from moving too fast


What are the two things a compound mitre saw does best at the same time?
a. moving it around and setting it up is fast.
b. You can cut left and right at the same time.
c. Tilting the blade 45 degrees and pivoting the table 45 degrees gives you a 90
degree square cut.
d. bevel and mitre cuts can be made at the same time - CORRECT ANSWER-d.
bevel and mitre cuts can be made at the same time

, Why do we use laminated glass in the walls of glass elevator cabs?
a. if the glass breaks you can get a replacement at the hardware store.
b. if the glass cracks the plastic interlayer holds the fragments
c. it is made in a variety of colors
d. it is easy to handle and installs quickly - CORRECT ANSWER-b. if the glass
cracks the plastic interlayer holds the fragments


Which of the following is NOT a step in preparing the walls before hanging
panels?
a. check walls for square and plumb
b. mount handrails on the walls where the panels will be installed.
c. clean surfaces and fill all holes not being used
d. preheat walls as per specifications - CORRECT ANSWER-b. mount handrails
on the walls where the panels will be installed


When installing a resilient tile floor covering, there should be a layer of
________ between the underlayment and the tiles.
a. plywood
b. grout
c. 15lb asphalt paper
d. tile separators - CORRECT ANSWER-c. 15 lb asphalt paper


While similar to laying resilient floor tiles, ceramic tiles require the additional
steps of:
a. grouting and sealing
b. stress testing and certification
c. glazing and firing
d. marking and cutting - CORRECT ANSWER-a. grouting and sealing

Document information

Uploaded on
October 17, 2026
Number of pages
33
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
189
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions