Question 1
Which answer gives the correct topic for each numbered focus, without exchanging their roles?
1. Verification of Documentation, Operating Manuals, and Customer Placards/Labels
2. Building Codes and Structural Standards (e.g., International Building Code [IBC],
International Residential Code [IRC])
A. 1: System Commissioning, Operation, and Performance Verification; 2: Codes, Standards, and
Regulations
B. 1: Codes, Standards, and Regulations; 2: System Commissioning, Operation, and Performance
Verification
C. 1: System Commissioning, Operation, and Performance Verification; 2: System Commissioning,
Operation, and Performance Verification
D. 1: Codes, Standards, and Regulations; 2: Codes, Standards, and Regulations
Correct Answer: A
Full Explanation: The correct associations are 1 with System Commissioning, Operation, and
Performance Verification (Verification of Documentation, Operating Manuals, and Customer
Placards/Labels); 2 with Codes, Standards, and Regulations (Building Codes and Structural
Standards (e.g., International Building Code [IBC], International Residential Code [IRC])).
Exchanging these topics changes the subject of one or more concerns rather than preserving their
distinct meanings.
Questions and Explanations 2
,SHSI NABCEP Solar Heating System Inspector Exam
Question 2
Several different issues need to be distinguished. Which answer identifies their topics in the
order shown?
1. Post-Inspection Reporting, Non-Compliance Documentation, and Sign-Off Procedures
2. Heat Transfer Fluids (HTF) Verification (fluid type, concentration, toxicity, freeze/boil
protection ratings)
3. handling heat transfer fluids, glycol toxicity ratings, high-temperature fluid handling
4. Auxiliary Energy Backup Integration (boilers, tankless water heaters, electric resistance
elements)
A. 1: System Commissioning, Operation, and Performance Verification; 2: Valves and Flow Control
Devices; 3: Thermal and Chemical Safety; 4: Control Systems, Sensors, and Electrical
Inspection
B. 1: Valves and Flow Control Devices; 2: System Commissioning, Operation, and Performance
Verification; 3: Thermal and Chemical Safety; 4: Control Systems, Sensors, and Electrical
Inspection
C. 1: Thermal and Chemical Safety; 2: System Commissioning, Operation, and Performance
Verification; 3: Control Systems, Sensors, and Electrical Inspection; 4: Valves and Flow Control
Devices
D. 1: System Commissioning, Operation, and Performance Verification; 2: Control Systems,
Sensors, and Electrical Inspection; 3: Thermal and Chemical Safety; 4: Valves and Flow
Control Devices
Correct Answer: A
Full Explanation: The correct associations are 1 with System Commissioning, Operation, and
Performance Verification (Post-Inspection Reporting, Non-Compliance Documentation, and
Sign-Off Procedures); 2 with Valves and Flow Control Devices (Heat Transfer Fluids (HTF)
Verification (fluid type, concentration, toxicity, freeze/boil protection ratings)); 3 with Thermal and
Chemical Safety (handling heat transfer fluids, glycol toxicity ratings, high-temperature fluid
handling); 4 with Control Systems, Sensors, and Electrical Inspection (Auxiliary Energy Backup
Integration (boilers, tankless water heaters, electric resistance elements)). Exchanging these
topics changes the subject of one or more concerns rather than preserving their distinct
meanings.
Questions and Explanations 3
, SHSI NABCEP Solar Heating System Inspector Exam
Question 3
Several different issues need to be distinguished. Which answer identifies their topics in the
order shown?
1. Sensor Placement, Mounting, and Calibration (collector sensors, storage tank sensors)
2. flow loops, flow direction, sizing
A. 1: Control Systems, Sensors, and Electrical Inspection; 2: Hydraulic and Piping Schematic
Analysis
B. 1: Hydraulic and Piping Schematic Analysis; 2: Control Systems, Sensors, and Electrical
Inspection
C. 1: Control Systems, Sensors, and Electrical Inspection; 2: Control Systems, Sensors, and
Electrical Inspection
D. 1: Hydraulic and Piping Schematic Analysis; 2: Hydraulic and Piping Schematic Analysis
Correct Answer: A
Full Explanation: The correct associations are 1 with Control Systems, Sensors, and Electrical
Inspection (Sensor Placement, Mounting, and Calibration (collector sensors, storage tank
sensors)); 2 with Hydraulic and Piping Schematic Analysis (flow loops, flow direction, sizing).
Exchanging these topics changes the subject of one or more concerns rather than preserving their
distinct meanings.
Question 4
Keep these concerns distinct. Which sequence of topics correctly matches the numbered
descriptions?
1. Permit Package Comparison against Proposed Designs
2. Post-Inspection Reporting, Non-Compliance Documentation, and Sign-Off Procedures
A. 1: Plan Review and Pre-Inspection Documentation; 2: System Commissioning, Operation, and
Performance Verification
B. 1: System Commissioning, Operation, and Performance Verification; 2: System Commissioning,
Operation, and Performance Verification
C. 1: Plan Review and Pre-Inspection Documentation; 2: Plan Review and Pre-Inspection
Documentation
D. 1: System Commissioning, Operation, and Performance Verification; 2: Plan Review and
Pre-Inspection Documentation
Correct Answer: A
Full Explanation: The correct associations are 1 with Plan Review and Pre-Inspection
Documentation (Permit Package Comparison against Proposed Designs); 2 with System
Commissioning, Operation, and Performance Verification (Post-Inspection Reporting,
Non-Compliance Documentation, and Sign-Off Procedures). Exchanging these topics changes the
subject of one or more concerns rather than preserving their distinct meanings.
Questions and Explanations 4