• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

DBIA Test Questions and Explained Answers (2026/2027)

Document preview thumbnail
Preview 2 out of 10 pages

This document contains questions and verified answers for DBIA Test . It includes detailed explanations, revision-focused content, and exam preparation material suitable for 2026/2027 students.

Content preview

DBIA Test

Advancing the design - ANS-foundation of design files that if modified, could allow for a trade
order, expectation that layout-builder will evaluation those files to discover and solve conflicts or
ambiguities, order of choice, determining submittal evaluation and approval process, meet and
confer method, proprietor to approve very last construction files, period in-between and very last
files are to be steady with the Basis of Design Documents

Alternative Technical Concept (ATC) - ANS-Proposers publish alternatives to mandatory
requirements which can be higher than or identical; if universal through owner, can be utilized in
technical notion; exclusive from fee engineering trade proposals

arbitration/litigation - ANS-binding dispute decision

auto liability - ANS-threat of legal responsibility to 0.33 parties for BI/PD as a result of
automobile accidents in reference to the venture

foundation for award - ANS-maximum general rating (technical score + rate rating)

fine exercise - ANS-the belief that there may be a way, method, or process this is greater
powerful at handing over a specific final results than another; with right procedure, exams, and
testing, a favored outcome can be added with fewer problems and unforeseen complications

exceptional cost - ANS-(performance + quality) / cost

pleasant price - ANS-selection standards are charge and non-price elements; 2 section
technique: RFQ to shortlist most highly qualified, RFP to obtain technical approach and fee;
determine assessment elements and relative weighting; price proposals opened after
assessment and scoring of technical proposals

betterment theory - ANS-proprietor cannot be put in a better function than if the breach hadn't
occurred

bridging documents - ANS-prescribes the way to obtain the cease end result

builder's chance (all risk) - ANS-first-birthday celebration coverage in opposition to bodily
damage to mission at some stage in creation; may be received either through owner or
design-builder, agreement or policy revisions that may be needed to cope with design-build:
layout related exclusions, all individuals of layout-build are named as insured, and waiver of
subrogation many of the design-construct group

, constructing information modeling (BIM) - ANS-The virtual, three-dimensional modeling of
building structures, with the linking of version components to a database of homes and
relationships. Allows real-time sharing of design evolution, drives early selection-making,
defines expectancies for layout segment deliverables, permits implementation of additional
makes use of for the database

charter, communications matrix, or trouble resolution ladder - ANS-formal partnering commonly
results in mutually developing considered one of 3 things

Choosing by way of blessings (CBA) - ANS-A method that lists the blessings of alternatives and
allows quick pick out the alternatives with the most benefits. This system avoids the double
counting inherent in listing pros and cons whilst in a single alternative is also the con in every
other.

Co-area - ANS-proximity ends in communique, communique results in expertise, information
ends in appreciate, recognize fosters cohesion, interdisciplinary fluency develops one crew, one
team acts as one crew

Commercial General Liability - ANS-insurance insurance type usually issued to contractors;
covers chance of legal responsibility to 1/3 parties, bodily injury/assets damage, and completed
operations. Does now not cover losses caused by professional services, monetary losses from
insured's own faulty product or different disasters to do paintings properly, harm to personal
work, or harm to very own property

not unusual law - ANS-based totally on use of precedent; arbitration and mediation
consequences don't offer direct precedent

competitive procurement system - ANS-proprietors outline their desires and choice criteria, one
or 2 section procedure if shortlisting is relevant, fee isn't a aspect in selection, award to most
qualified proposer, negotiate to a honest and reasonable price

Consequential Damages - ANS-rise up from the outcomes of a breach; frequently "large"
damages which are tough to show, hard to manipulate or expect, and typically involve damages
to 0.33 events; create massive economic publicity if some thing is going incorrect

creation supervisor at danger - ANS-similar org structure to DBB, construction supervisor
selected by means of QBS or nice price, contractor affords precon offerings, negotiated gmp
contracting approach, open e book estimating manner, potential to fast music challenge,
construction price determined earlier than layout completed, ability issues over what is
reasonably inferable from gmp design documents

Constructive Acceleration - ANS-A contractor might also favor to speed up a task because of an
excusable or unavoidable postpone because of climate, deliveries or exchange orders. The
contractor might also pick to document a claim for damages if the greater time is warranted

Document information

Uploaded on
October 14, 2026
Number of pages
10
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ashley96
4.1
(178)
Sold
658
Followers
200
Items
5855
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions