• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

ICC Spray-Applied Fireproofing Special Inspector Certification – Full-Length Practice Examination

Document preview thumbnail
Preview 3 out of 27 pages

ICC Spray-Applied Fireproofing Special Inspector Certification – Full-Length Practice Examination

Content preview

1



ICC Spray-Applied Fireproofing Special
Inspector Certification – Full-Length Practice
Examination
Domain 1: Special Inspection Fundamentals
& ICC Certification (Questions 1–20)
Question 1: What is the primary purpose of special inspection for spray-applied
fireproofing?

A) To increase the fire rating of structural members
B) To verify that sprayed fire-resistive materials comply with approved plans and
specifications
C) To replace the building official's inspection responsibilities
D) To reduce construction costs

CorreCt Answer: B
Rationale: The Spray-applied Fireproofing Special Inspector is responsible for enforcing the
construction details contained in the approved plans and specifications for sprayed fire-
resistive materials. The inspector verifies that SFRM applied to structural members complies
with the plans and specifications, including preparation, application, and testing .

Question 2: Under which International Building Code section is special inspection for spray-
applied fireproofing required?

A) Section 1704
B) Section 1705.1
C) Section 1705.11
D) Section 1707

CorreCt Answer: C
Rationale: IBC Section 1705.11 specifically requires special inspections for sprayed fire-
resistant materials applied to structural members and assemblies .

Question 3: What is the exam ID for the ICC Spray-Applied Fireproofing Special Inspector
certification?

A) 80
B) 82

, 2


C) 86
D) 90

CorreCt Answer: C
Rationale: The ICC certification exam ID for Spray-applied Fireproofing Special Inspector is 86
.

Question 4: How many exam modules must a candidate pass to achieve the ICC Spray-
Applied Fireproofing Special Inspector certification?

A) One comprehensive exam
B) Two modules: General Requirements and Codes & Plans
C) Three modules: General, Technical, and Practical
D) Four modules

CorreCt Answer: B
Rationale: The spray-applied fireproofing special inspector certification requires passing two
exam modules: General Requirements (GR) and Codes and Plans (86) .

Question 5: How many questions are in the Codes and Plans module of the ICC Spray-
Applied Fireproofing exam?

A) 25 questions
B) 30 questions
C) 40 questions
D) 50 questions

CorreCt Answer: B
Rationale: The Codes and Plans module contains 30 questions with a 1-hour, 30-minute time
limit. The General Requirements module contains 25 questions .

Question 6: What is the time limit for the General Requirements module of the ICC SFSI
exam?

A) 45 minutes
B) 1 hour
C) 1 hour, 30 minutes
D) 2 hours

CorreCt Answer: B
Rationale: The General Requirements module has a 1-hour time limit for 25 questions .

Question 7: Is the ICC Spray-Applied Fireproofing Special Inspector exam open book?

, 3


A) No, it is closed book
B) Yes, it is open book
C) Only the Codes and Plans module is open book
D) Only the General Requirements module is open book

CorreCt Answer: B
Rationale: The ICC SFSI exam is open book, allowing candidates to reference approved code
books and standards during the examination .

Question 8: What is the renewal period for the ICC Spray-Applied Fireproofing Special
Inspector certification?

A) 1 year
B) 2 years
C) 3 years
D) 5 years

CorreCt Answer: C
Rationale: The ICC SFSI certification must be renewed every 3 years .

Question 9: How many CEUs are required for renewal of the ICC SFSI certification?

A) 1.0 CEU
B) 1.5 CEUs
C) 2.0 CEUs
D) 3.0 CEUs

CorreCt Answer: B
Rationale: ICC requires 1.5 CEUs for each certification renewal, unless otherwise noted .

Question 10: Who must the special inspector notify when deviations from approved plans
and specifications are not corrected?

A) Only the contractor
B) The architect or engineer of record and the building official
C) Only the building official
D) The fire marshal

CorreCt Answer: B
Rationale: The special inspector must notify the contractor of deviations. If the deviations
are uncorrected, the inspector must notify the architect or engineer of record and the
building official .

Question 11: What type of reports must the special inspector submit?

Document information

Uploaded on
October 14, 2026
Number of pages
27
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Tutoringclass
4.0
(275)
Sold
142
Followers
60
Items
2558
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions