• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

WGU D559 Advanced Managerial Accounting: Key Terms Flashcards

Document preview thumbnail
Preview 1 out of 3 pages

WGU D559 Advanced Managerial Accounting: Key Terms Flashcards

Content preview

WGU D559 Advanced Managerial Accounting: Key Terms
Flashcards
Fold the page down the middle: term on the left, answer on the right

Units 1-2: Cost Concepts and Behavior
1. Product costs DM, DL and MOH; attach to inventory until sold.

2. Period costs Selling and administrative costs; expensed when incurred.

3. Prime cost Direct materials + direct labor.

4. Conversion cost Direct labor + manufacturing overhead.

5. Cost of goods manufactured Beg WIP + DM used + DL + MOH - End WIP.

6. Opportunity cost Benefit forgone by choosing one alternative over another.

7. Sunk cost Cost already incurred; irrelevant to decisions.

8. Relevant range Activity range where cost behavior assumptions hold.

9. Mixed cost Cost with fixed and variable components.

Variable rate = change in cost / change in activity (high vs low
10. High-low method
activity).

11. Contribution margin Sales - variable expenses.

12. CM ratio CM / sales.


Units 3-5: Product Costing Systems
13. Job-order costing Costs tracked by individual job.

14. Predetermined overhead rate Estimated MOH / estimated allocation base.

15. Applied overhead POHR x actual allocation base used.

16. Underapplied overhead Actual MOH exceeds applied MOH.

17. Overapplied overhead Applied MOH exceeds actual MOH.

18. Process costing Costs accumulated by department for identical units.

19. Equivalent units (weighted
Units completed + ending WIP x % complete.
average)

20. FIFO method Separates work on beginning WIP from current-period work.

21. Activity-based costing Assigns overhead using multiple activity pools and drivers.

22. Batch-level activity Performed for each batch, e.g., setups.

23. Facility-level activity Sustains the whole organization, e.g., plant security.

24. Activity rate Activity cost pool / total expected activity.

Document information

Uploaded on
October 14, 2026
Number of pages
3
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
332
Last sold
-




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions