• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 52 pages
Exam (elaborations)

Oklahoma Refrigeration Contractor Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationale 2027 Q&A| Instant Download Pdf

Document preview thumbnail
Preview 4 out of 52 pages

Oklahoma Refrigeration Contractor Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationale 2027 Q&A| Instant Download Pdf

Content preview

Oklahoma Refrigeration Contractor
Exam Practice Questions And Correct
Answers (Verified Answers) Plus
Rationale 2027 Q&A| Instant
Download Pdf.


1. A refrigeration contractor is preparing to install a commercial
refrigeration system in Oklahoma. Which activity is most directly
within the scope of a Refrigeration Contractor license?

A. Installing residential electrical service equipment
B. Installing, altering, servicing, maintaining, or repairing refrigeration
systems and their process piping
C. Installing domestic water distribution systems only
D. Installing structural steel for a commercial building

B. Installing, altering, servicing, maintaining, or repairing refrigeration
systems and their process piping

The Oklahoma Refrigeration Contractor license covers the installation,
alteration, modification, service, maintenance, and repair of

,refrigeration products, systems, equipment, and associated process
piping.

2. A refrigeration compressor is rated for a particular voltage and
frequency. Which condition is most likely to cause excessive motor
current if the motor is otherwise operating normally?

A. Correct supply voltage at the rated frequency
B. Supply voltage substantially below the motor's rated voltage
C. Properly sized conductors with minimal voltage drop
D. Correct phase sequence on a three-phase motor

B. Supply voltage substantially below the motor's rated voltage

Undervoltage can cause a motor to draw increased current while
attempting to produce the required torque, potentially causing
overheating and motor damage.

3. A technician measures voltage across an energized refrigeration
contactor coil and obtains the rated control voltage. However, the
contactor does not pull in. Which condition should be investigated
first?

A. Open or defective contactor coil
B. Low refrigerant charge
C. Dirty condenser coil
D. Restricted liquid-line filter-drier

A. Open or defective contactor coil

,If the correct voltage is present directly across the coil and the contactor
does not energize, the coil itself or its mechanical assembly is a primary
suspect.

4. In a basic vapor-compression refrigeration cycle, what is the
principal function of the compressor?

A. Convert liquid refrigerant into vapor at the evaporator outlet
B. Reduce refrigerant pressure before the evaporator
C. Raise the pressure and temperature of refrigerant vapor and circulate
it through the system
D. Remove moisture from the refrigerant

C. Raise the pressure and temperature of refrigerant vapor and circulate
it through the system

The compressor receives low-pressure vapor from the evaporator and
compresses it into high-pressure, higher-temperature vapor before
discharge to the condenser.

5. Which component normally removes heat from the refrigerated
space?

A. Condenser
B. Evaporator
C. Receiver
D. Compressor

B. Evaporator

, The evaporator absorbs heat from the refrigerated space or product as
liquid refrigerant changes phase and evaporates within the coil.

6. What is the primary function of a condenser in a vapor-compression
refrigeration system?

A. Absorb heat from the refrigerated space
B. Increase refrigerant superheat before compression
C. Reject heat from the refrigerant to the surrounding medium
D. Meter liquid refrigerant into the evaporator

C. Reject heat from the refrigerant to the surrounding medium

The condenser removes heat absorbed in the evaporator plus the
compressor's heat of compression, causing high-pressure refrigerant
vapor to condense into liquid.

7. Which refrigeration component is specifically designed to meter
refrigerant into an evaporator while producing a pressure drop?

A. Receiver
B. Expansion device
C. Accumulator
D. Discharge muffler

B. Expansion device

An expansion device controls refrigerant flow into the evaporator and
creates the pressure reduction required for low-pressure evaporation.

Document information

Uploaded on
October 13, 2026
Number of pages
52
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Drprep
4.0
(168)
Sold
892
Followers
15
Items
22638
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions