CMIT EXAM (200 MULTIPLE CHOICE)
UPDATED ACTUAL QUESTIONS WITH CORRECT
ANSWERS

Question 1.
Under a fixed price or lump sum contract, the contractors can be asked to bid on work based on
partially completed documents (scope bid), or a complete set of drawings and specifications.
True False

ANSWER
True



Question 2.
There are no accepted industry-wide standards or guidelines for determining what is considered to be
reasonable and fair compensation for construction management services.
True False

ANSWER
False



Question 3.
To the extent that a CM assumes the designer's responsibilities for cost estimates, the CM faces the
same liability as similarly situated designers.
True False

ANSWER
True



Question 4.
Sustainable materials are composed of nonrenewable resources.
True False

ANSWER
False






,Question 5.
The contractor is obligated to notify the CM of conflicts, errors and/or discrepancies in the contract
documents.
True False

ANSWER
True



Question 6.
One of the stipulations of the CMAA Code of Professional Ethics is that a CM should charge fees and
expenses that are reasonable.
True False

ANSWER
True



Question 7.
Prior to the workshop it is helpful to have job site interviews with field representatives of the parties.
True False

ANSWER
True



Question 8.
If a designer uses the CMAA A-4 contract document instead of the AIA B132-2009 document, the
designer's exposure to professional liability during the construction phase is reduced.
True False

ANSWER
True



Question 9.
What is the term sometimes used to describe the standard language of the full set of contract
documents? A) Special provisions
B) MasterFormat
C) Boiler plate
D) Contract agreement

ANSWER
C) Boiler plate






,Question 10.
A mini-trial, whether required by contract or agreed to voluntarily, results in a binding decision.
True False

ANSWER
False



Question 11.
There is more than one type of legal relationship that may exist between an owner and the CM.
True False

ANSWER
True



Question 12.
The parties to a contract need to have a ________________ in order to make an accurate economic
judgment as to cost.
A) budget
B) schedule
C) specific project design
D) specific scope statement

ANSWER
D) specific scope statement



Question 13.
The use of a BIM model on a project can lead to faster construction as a result of which of the following
factors?
A) Increased prefabrication
B) Increased changes
C) Reduced claims
D) Reduced design

ANSWER
A) Increased prefabrication






, Question 14.
Arrangements to select a form of alternative dispute resolution can be made by contractual agreement
or at the time a dispute arises.
True False

ANSWER
True



Question 15.
The parties, namely, the owner, the designer, CM, contractor and others, can be described as
stakeholders. True False

ANSWER
True



Question 16.
Most definitions of construction management are similar. However, a contractual definition is not
known until:
A) The legal form of the CM contract is chosen.
B) The specific scope of services to be provided is identified.
C) The relationship of the CM to others and the risks and authority assumed by the parties are clearly
defined.
D) All of the above

ANSWER
D) All of the above



Question 17.
The CM does not have the responsibility to generate and track the project budget.
True False

ANSWER
False

Document information

Uploaded on
October 13, 2026
Number of pages
47
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(18)
Sold
210
Followers
6
Items
64143
Last sold
9 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions