• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 107 pages
Exam (elaborations)

New Hampshire Septic System Installer Practice Exam 350 Real Exam Questions And Correct Detailed Answers (Verified Answers) With Rationales Already Graded A+

Document preview thumbnail
Preview 4 out of 107 pages

Comprehensive 350-question New Hampshire Septic System Installer practice exam covering state regulations, permits, approved plans, septic tanks, piping, effluent disposal areas, installation procedures, inspections, site conditions, repairs, troubleshooting, and installer responsibilities. Includes answers and detailed explanations for focused licensing exam preparation.

Content preview

New Hampshire Septic System Installer
Practice Exam 350 Real Exam Questions And
Correct Detailed Answers (Verified Answers)
With Rationales Already Graded A+
1. Which New Hampshire state agency has primary regulatory authority over the design,
installation, and permitting of individual sewage disposal systems (ISDS)?
A) Department of Health and Human Services
B) Department of Environmental Services (NHDES)
C) Department of Transportation
D) Office of Professional Licensure and Certification
Answer: B
Rationale: NHDES Subsurface Systems Bureau administers RSA 485-A and Env-Wq 1000 for ISDS
permitting.




2. What is the primary statutory authority for New Hampshire's subsurface wastewater disposal
regulations?
A) RSA 147
B) RSA 485-A:29-44
C) RSA 485-C
D) RSA 485-B
Answer: B
Rationale: RSA 485-A:29-44 establishes the regulatory framework for subdivisions and individual sewage
disposal systems.




3. What is the administrative rule chapter that implements RSA 485-A:29-44?
A) Env-Wq 700

,B) Env-Wq 1000
C) Env-Wq 1600
D) Env-Ws 1000
Answer: B
Rationale: Env-Wq 1000 contains the rules for subdivisions and individual sewage disposal systems.




4. Prior to 1967, were state-issued septic system approvals required in New Hampshire?
A) Yes, statewide
B) No, state approvals began in 1967 for areas within 1,000 feet of surface waters
C) Yes, but only in certain counties
D) No, state approvals began in 1971
Answer: B
Rationale: NHDES began requiring approvals in 1967 for areas within 1,000 feet of surface waters;
statewide in 1971.




5. What are the two required approvals for an ISDS before it can be put into use?
A) Local approval and state approval
B) Approval for Construction (CA) and Approval for Operation (OA)
C) Building permit and septic permit
D) Design approval and installation approval
Answer: B
Rationale: Both CA and OA are required before an ISDS can be put into use.




6. Who issues the Approval for Construction (CA)?
A) Local health officer
B) NHDES Review Staff
C) NHDES Inspection Staff
D) The permitted designer

2

,Answer: B
Rationale: The CA is issued by Review Staff after review of an ISDS plan and application.




7. Who issues the Approval for Operation (OA)?
A) Local health officer
B) NHDES Review Staff
C) NHDES Inspection Staff
D) The permitted installer
Answer: C
Rationale: The OA is issued by SSB Inspection Staff after an inspection of completed ISDS installation.




8. How are Approval for Operation and Approval for Construction related?
A) They are independent
B) They share the same approval number
C) The OA must be obtained first
D) The CA expires when the OA is issued
Answer: B
Rationale: Approvals for Operation are linked to an Approval for Construction and share the same
approval number.




9. When is a new Approval for Construction required?
A) Only when building a new structure
B) Construction of a new structure generating domestic wastewater, increases in load, expansion of
structure footprints unless exempt
C) Only when the system fails
D) Every 10 years
Answer: B
Rationale: A new CA is required for new construction, increased load, and footprint expansion.

3

, 10. When is a new Approval for Operation required?
A) Only when building a new structure
B) Construction of a new septic system, systems in failure, some conversions of use
C) Every 5 years
D) Only when the system is pumped
Answer: B
Rationale: A new OA is required for new systems, failing systems, and certain use conversions.




11. How long is an Approval for Construction valid for a failed replacement system?
A) 90 days
B) 180 days
C) 1 year
D) 2 years
Answer: B
Rationale: Approvals for Construction for failed replacements are valid for 180 days.




12. What is the primary purpose of the NHDES Subsurface Systems Bureau?
A) To install septic systems
B) To develop rules and issue permits for septic systems
C) To pump septic tanks
D) To design septic systems
Answer: B
Rationale: NHDES SSB develops base state-wide rules and issues approvals and permits.




13. What authority do local health officers have regarding septic systems?
A) Issuing state permits

4

Document information

Uploaded on
October 13, 2026
Number of pages
107
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$19.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AcademicACHIEVER
3.4
(104)
Sold
580
Followers
24
Items
13203
Last sold
18 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions