• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

LEEA Appointed Person Lifting Operations Practice Exam: Original Questions with Answers

Document preview thumbnail
Preview 3 out of 24 pages

LEEA Appointed Person Lifting Operations Practice Exam: Original Questions with Answers

Content preview

1


LEEA Appointed Person Lifting Operations Practice Exam: Original Questions with Answers

Section 1: Legislation, Standards & Regulatory Framework (Questions 1–20)

Q1. Under LOLER 1998, what is the maximum interval for a thorough examination of lifting
equipment used for lifting persons?

A. Every 12 months
B. Every 6 months
C. Every 24 months
D. Every 4 years

Answer: B
Rationale: LOLER Regulation 9 requires thorough examination of lifting equipment used for
lifting persons every 6 months. Accessories such as personnel lifting baskets fall under this
stricter interval .

Q2. Which regulation specifically requires that lifting operations are properly planned,
appropriately supervised, and carried out safely?

A. PUWER 1998
B. LOLER 1998
C. HSWA 1974
D. BS 7121

Answer: B
Rationale: LOLER Regulation 8 requires lifting operations to be properly planned by a
competent person, appropriately supervised, and carried out safely .

Q3. What does PUWER require regarding lifting equipment?

A. Nothing specific to lifting
B. Only operator competence
C. Equipment must be suitable, maintained, and safe for use
D. Only annual inspection

Answer: C
Rationale: PUWER ensures all work equipment, including lifting gear, is safe and fit for
purpose .

Q4. Under LOLER 1998, how often must a chain sling used for general lifting be thoroughly
examined if no alternative schedule is specified?

A. Every 6 months
B. Every 12 months
C. Every 24 months
D. Every 4 years

, 2


Answer: A
Rationale: LOLER 1998 requires lifting accessories such as chain slings to be thoroughly
examined every 6 months .

Q5. Which document must be in place before any lifting operation commences, according to
BS 7121-1?

A. Crane operator's license
B. Risk assessment and method statement (RAMS)
C. Insurance certificate
D. Site induction record

Answer: B
Rationale: BS 7121-1 requires a written risk assessment and a method statement as
fundamental planning documents for all lifting operations .

Q6. What is the primary duty of the Appointed Person under LOLER and BS 7121?

A. Operate the crane
B. Plan and control lifting operations safely
C. Repair lifting equipment
D. Drive site vehicles

Answer: B
Rationale: The Appointed Person is responsible for ensuring that lifting operations are
properly planned, organized, supervised, and carried out safely .

Q7. What is the difference between a Contract Lift and a Crane Hire?

A. There is no difference
B. In a Contract Lift, the crane company supplies the Appointed Person and assumes
responsibility for planning and supervision
C. Crane Hire includes the Appointed Person
D. Contract Lift is cheaper

Answer: B
Rationale: Under a Contract Lift, the crane company supplies the Appointed Person and is
responsible for planning, supervision, insurance of all equipment, and ensuring a safe system
of work .

Q8. Who is defined as a "competent person" under LOLER?

A. Anyone with a job title containing "manager"
B. Someone with appropriate knowledge, training, and experience
C. The newest employee
D. Anyone who owns a crane

, 3


Answer: B
Rationale: Competence depends on appropriate knowledge, practical skills, training, and
experience for the work involved .

Q9. What is the primary purpose of a risk assessment in lifting operations?

A. To increase crane capacity
B. To identify hazards and establish appropriate controls
C. To replace operator training
D. To eliminate supervision

Answer: B
Rationale: Risk assessment systematically identifies hazards and determines measures
needed to reduce risk to an acceptable level .

Q10. Which of the following is a critical element of a lifting operation risk assessment?

A. Crane brand
B. Weather conditions and load weight
C. Operator's salary
D. Equipment colour

Answer: B
Rationale: Risk assessment must consider weather conditions, load weight and centre of
gravity, site conditions, and proximity hazards .

Q11. What does SWL generally refer to?

A. Standard Wire Length
B. Safe Working Load
C. Site Weight Limit
D. Sling Width Level

Answer: B
Rationale: SWL (Safe Working Load) is a traditional term used to describe the permissible
load for lifting equipment under specified conditions .

Q12. What is WLL?

A. Wire Length Level
B. Working Load Limit
C. Weight Loading Line
D. Working Lift Length

Answer: B
Rationale: WLL (Working Load Limit) is the maximum load that an item of lifting equipment
or accessory is designated to lift under specified conditions .

Document information

Uploaded on
October 13, 2026
Number of pages
24
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$26.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Tutoringclass
4.0
(275)
Sold
142
Followers
60
Items
2558
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions