MSSC 4.0 QUALITY PRACTICES AND MEASUREMENT
FREQUENTLY TESTED ACTUAL EXAM QUESTIONS WITH
CORRECT ANSWERS
Question 1.
To reduce variation, cycle time are considered
ANSWER
minimize defects, and to shorten quality __________ goals
Question 2.
Kaizen, Kanban, and ments used in a(n)
ANSWER
5S are just a few of many ele- Just In Time (JIT) __________ operation.
Question 3.
Eliminating quality
ANSWER
variances will result in __________. Improved process quality
Question 4.
The number of defects __________.
ANSWER
produced is a measure of The effectiveness of a quality assurance system
Question 5.
The purpose of ISO __________.
ANSWER
9000 is to help companies Improve quality
Question 6.
Companies often surement for improvements
ANSWER
__________ to create a baseline mea- Establish a metric in machine performance.
1/5
, Question 7.
Product development __________ as early process.
ANSWER
teams should perform a(n) Design Failure Mode and as possible during their design Effects
Analysis
Question 8.
An employee should following situation
ANSWER
report to their supervisor if the There is an increase in the occurs: number of defective parts
produced by a machine
Question 9.
Joseph M. Juran, W. Crosby contributed __________.
ANSWER
Edwards Deming, and C. Phillip TQM, Total Quality Manto the various approaches of agement
Question 10.
First piece inspection
ANSWER
is required for __________. Documenting repeatable setups
Question 11.
The quality management time team to solving QMS.
ANSWER
Six Sigma system that dedicates a full problems is called a __________
Question 12.
Spreadsheets are __________ and produce
ANSWER
used to perform calculations in Rows and columns graphs.
2/5
FREQUENTLY TESTED ACTUAL EXAM QUESTIONS WITH
CORRECT ANSWERS
Question 1.
To reduce variation, cycle time are considered
ANSWER
minimize defects, and to shorten quality __________ goals
Question 2.
Kaizen, Kanban, and ments used in a(n)
ANSWER
5S are just a few of many ele- Just In Time (JIT) __________ operation.
Question 3.
Eliminating quality
ANSWER
variances will result in __________. Improved process quality
Question 4.
The number of defects __________.
ANSWER
produced is a measure of The effectiveness of a quality assurance system
Question 5.
The purpose of ISO __________.
ANSWER
9000 is to help companies Improve quality
Question 6.
Companies often surement for improvements
ANSWER
__________ to create a baseline mea- Establish a metric in machine performance.
1/5
, Question 7.
Product development __________ as early process.
ANSWER
teams should perform a(n) Design Failure Mode and as possible during their design Effects
Analysis
Question 8.
An employee should following situation
ANSWER
report to their supervisor if the There is an increase in the occurs: number of defective parts
produced by a machine
Question 9.
Joseph M. Juran, W. Crosby contributed __________.
ANSWER
Edwards Deming, and C. Phillip TQM, Total Quality Manto the various approaches of agement
Question 10.
First piece inspection
ANSWER
is required for __________. Documenting repeatable setups
Question 11.
The quality management time team to solving QMS.
ANSWER
Six Sigma system that dedicates a full problems is called a __________
Question 12.
Spreadsheets are __________ and produce
ANSWER
used to perform calculations in Rows and columns graphs.
2/5