What should a special inspector do when a discrepancy is
discovered?
A. Ignore it if the work is nearly complete
B. Immediately bring it to the contractor’s attention for correction
C. Approve it automatically
D. Remove the contractor from the project
Answer: B. Immediately bring it to the contractor’s attention for
correction
Rationale: The 2024 IBC requires discrepancies to be brought to the
immediate attention of the contractor for correction. If they are not
corrected, they must then be brought to the attention of the building
official and registered design professional in responsible charge.
If a discrepancy is not corrected, who must be notified?
A. Only the material supplier
B. Only the owner
C. The building official and registered design professional in
responsible charge
D. Only the contractor’s insurer
,Answer: C. The building official and registered design professional
in responsible charge
Rationale: If discrepancies remain uncorrected, Section 1704.2.4
requires notification to both the building official and registered
design professional in responsible charge before completion of that
phase of work.
What must the special inspection report indicate concerning
inspected work?
A. Whether the contractor has been paid
B. Whether the work conforms to the approved construction
documents
C. Whether the owner is satisfied
D. Whether the project is profitable
Answer: B. Whether the work conforms to the approved
construction documents
Rationale: Special inspection reports must indicate whether the
inspected or tested work was completed in conformance with the
approved construction documents.
Who is responsible for providing access to construction requiring
special inspection?
A. The contractor
B. The building occupant
C. The material supplier
D. The testing laboratory
,Answer: A. The contractor
Rationale: The construction or work requiring special inspection
must remain accessible and exposed until the required inspection or
testing has been completed. Providing appropriate access is part of
the construction process controlled by the contractor.
What is required before work subject to special inspection is
concealed?
A. The required special inspection or testing must be completed
B. The owner must sell the property
C. The contractor must obtain a new building permit
D. The inspector must leave the project
Answer: A. The required special inspection or testing must be
completed
Rationale: Section 1704.2.2 requires construction subject to special
inspection or testing to remain accessible and exposed until
completion of the required inspection or testing.
Who is generally responsible for notifying the special inspector that
inspection work is ready?
A. The contractor
B. The building occupant
C. The code publisher
D. The insurance company
Answer: A. The contractor
, Rationale: The contractor coordinates the construction activities and
must provide access and coordination necessary for required special
inspections. Jurisdictional procedures may prescribe specific
notification methods.
What does the statement of special inspections identify?
A. Only the project cost
B. Materials, systems, components and work requiring special
inspection or testing
C. Only the contractor’s employees
D. Only the building’s occupancy classification
Answer: B. Materials, systems, components and work requiring
special inspection or testing
Rationale: Section 1704.3.1 requires the statement to identify
materials, systems, components and work requiring special
inspections or tests, as well as the type and extent of those inspections
and tests.
Which additional information is identified in the statement of special
inspections?
A. The contractor’s payroll
B. The type and extent of each special inspection
C. The building’s resale value
D. The owner’s tax information
Answer: B. The type and extent of each special inspection