• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

ASTM C702 Test Questions with Verified Correct Answers

Document preview thumbnail
Preview 2 out of 5 pages

ASTM C702 Test Questions with Verified Correct Answers

Content preview

ASTM C702 Test Questions with Verified
Correct Answers
C702

For Method B- Quartering the apparatus used shall consist of _____

straight edged scoop, shovel, or trowel;

broom or brush;

canvas blanket approximately 6 by 8 feet

C702

What is step 1 of 6 for the procedure for Method B (quartering)?

Place on hard, clean level surface.

C702

What is step 2 of 6 for the procedure for Method B (quartering)?

Mix by turning over the entire sample over three times, with the last make a conical pile.

C702

What is step 3 of 6 for the procedure for Method B (quartering)?

Carefully flatten to uniform thickness and diameter by pressing down the apex with a shovel.

C702

What is step 4 of 6 for the procedure for Method B (quartering)?

The diameter should be 4 to 8 times the thickness.

C702

What is step 5 of 6 for the procedure for Method B (quartering)?

, Divide the flattened mass into 4 equal quarters, remove 2 diagonally opposite quarters,

collect all fines.

What is step 6 of 6 for the procedure for Method B (quartering)?

Mix and repeat until the sample is reduced to the desired size.

True or False? Method C is permitted for coarse aggregates or mixtures of coarse and

fine aggregates.

False (Section 5.2)

C702 Method A

For dry fine aggregate in which the entire sample will pass the 9.5 mm (3/8 in) sieve, a

splitter having chutes _____ to _____ wide should be used.

12.5 to 20 mm [1/2 to 3/4 in.] (Section 7.1)

C702

(Method A) For coarse aggregate and mixed aggregate, the minimum width of the

individual chutes shall be approximately _____ _____ than the largest particles in the

sample to be split.

50% larger (Section 7.1)

C702

Sample splitters shall have an even number of equal width chutes, but not less than a

total of _____ for fine aggregate.

12 (Section 7.1)

Document information

Uploaded on
October 10, 2026
Number of pages
5
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
121
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions