• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

PJM Generation Dispatcher Exam Practice | UPDATED Questions with 100% Verified Answers

Document preview thumbnail
Preview 2 out of 7 pages

PJM Generation Dispatcher Exam Practice | UPDATED Questions with 100% Verified Answers

Content preview

PJM Generation Dispatcher Exam Practice | UPDATED
Questions with 100% Verified Answers
Q1: An EXCITER on a traditional generator does what?
A: Voltage regulation (AVR) if you change the excitation current, you change the voltage.


Q2: ECO Min, ECO Max, and EMERG Max are genrator
_________________.
A: Limits


Q3: When synchronizing to the interconnection, what needs to be
synchronized?
A: Frequency, Voltage, and phase angle.


Q4: GMD (GeoMagnetic Disturbance) procedure is implemented
when?
A: 10A or greater is measured by special equipment at Missouri Ave or Meadowbrook and
the measurement is confirmed by one of the following other sources: Excess transformer
current @ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR requirements on
transformers @ Hopw Creek or Salem nuclear subs, or high DC measurements @ Limerick
or Peach Bottom.


Q5: What are the 2 types of National Terrorism Advisory Alerts?
A: Elevated and Imminent.


Q6: What action does PJM take for a terrorist attack, fuel delivery
emergency, or GMD's?
A: Conservative Operations


Q7: What does PJM put the most emphasis on during a
terrorist/sabotage event?
A: Operations and Communications


Q8: What does PJM request during a low voltage alert?
A: RRC - reactive reserve check


Q9: PJM issues a Heavy Load Voltage Warning how many hours
prior to implementation?
A: 4 hours

, Q10: What should generation owners/operators do during a High
System Voltage Action?
A: Operate at the lower bandwidth of the voltage schedule.


Q11: How many hours do you have to report a 24-hr reportable
NERC disturbance?
A: 6 hours


Q12: What report is generated during a Max Emergency Gen Alert?
A: SSR - Supplementary Status Report


Q13: What part of the SSR is the Fuel Limited Resources accounted
for?
A: Part G Resource Limited Units which are units that are not able to run at max capacity for
more than 72 hours.


Q14: What kind of Emergency Procedures occur during real time
operating hours?
A: Actions


Q15: What is the per Unit (p.u.) for a 345 kV nominal voltage that is
currently at 348 kV?
A: 348/345 = 1.008 pu


Q16: What is the Emergency Reducible Generation (ERG) if the Eco
Min is 100 and the Emergency Min is 75?
A: Eco Min - Emerg Min = 25MW


Q17: How many Black Start units are required for critical load/TO
zone?
A: 2 Black Start units


Q18: What is the minimum amount of hours for fuel supply for Black
Start units?
A: 10 hours, must notify PJM when it reaches that level.


Q19: Regulation must be attainable within how many minutes?
A: 5


Q20: ACE - Area Control Error is used to balance what 2 things?
A: Generation and Load

Document information

Uploaded on
October 7, 2026
Number of pages
7
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamsCollection
3.9
(45)
Sold
259
Followers
9
Items
40196
Last sold
18 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions