GCSS ARMY UPDATED EXAM QUESTIONS
AND CORRECT ANSWERS
●● System number change
Answer: IB52
●● Consume Basic Load
Answer: Migo201
●● Execute a mass modification of PO and PR
Answer: ZMODRPT
●● Used to receive components
Answer: VL06I
●● SLOC used to add or remove property from the property book
Answer: CDR
●● List material at the work order level
Answer: IW38
●● Status displayed to indicate that a PB01 work order is complete
, Answer: TECO
●● Triggered once a request for material master record for non-standard
is designated as an end item
Answer: ZNSWS
●● Substitutions that G army has the capability of applying to reports
and PHR
Answer: In lieu of
●● List reservations
Answer: MB25
●● Who can create and inventory
Answer: PB and US
●● Who can convert a PR to PO
Answer: PBO
●● Creates a PR for stock material
Answer: ME51N
●● Displays all inbound deliveries
AND CORRECT ANSWERS
●● System number change
Answer: IB52
●● Consume Basic Load
Answer: Migo201
●● Execute a mass modification of PO and PR
Answer: ZMODRPT
●● Used to receive components
Answer: VL06I
●● SLOC used to add or remove property from the property book
Answer: CDR
●● List material at the work order level
Answer: IW38
●● Status displayed to indicate that a PB01 work order is complete
, Answer: TECO
●● Triggered once a request for material master record for non-standard
is designated as an end item
Answer: ZNSWS
●● Substitutions that G army has the capability of applying to reports
and PHR
Answer: In lieu of
●● List reservations
Answer: MB25
●● Who can create and inventory
Answer: PB and US
●● Who can convert a PR to PO
Answer: PBO
●● Creates a PR for stock material
Answer: ME51N
●● Displays all inbound deliveries