ANAPLAN LEVEL 1 MODEL BUILDING FULLY
SOLVED TEST PAPER GRADED A+
◉ What is Anaplan Planual?
Answer: The Planual provides a systematic set of standards for
model building on the Anaplan platform.
Designed to produce the most efficient, usable, and scalable Anaplan
models, while dramatically increasing performance for models in all
contexts.
◉ When to create a change communication plan?
Answer: During project planning.
Adjust this plan throughout the release phases.
◉ What are all the phases of Anaplan implementation?
Answer: 1. Pre-release
2. Foundation
3. Implementation
4. Testing
5. Deployment
◉ When does Pre-release phase begin?
,Answer: When a customer asks for an estimate.
Complete a form & participate in short scoping session --> Rough cut
estimate.
If decides to move forward --> full scope meeting --> Statement of
Work (SOW).
Once SOW signed --> project is added to the implementation project
schedule.
◉ What is Statement of Work and what does it define?
Answer: The Statement of Work is a letter of intent. It definesL
- project-specific activities
- project deliverables
- project timeline
- business requirements
- pricing
◉ What SOW estimates?
Answer: - size of the model (memory requirement or size in
memory)
- scope of work (business requirements)
- level of effort to design and build the model
◉ What are model size considerations?
, Answer: - each cell is approx 10 bytes of data
- also include memory for the list members and list properties
- can't use this method to calculate size of a Polaris model
◉ User base and concurrency estimates
Answer: - who will be accessing the model and how often?
- having an accurate estimate of how many users will be using
Anaplan at the same time is critical to building the model to meet
performance expectations.
- a distributed model may be required
◉ What is scope of work?
Answer: defines all the business requirements
◉ What does project scope describe?
Answer: - current state overview
- project objectives
- a high level drawing of the ecosystem, with the Anaplan solution
identified
- known unknowns
◉ What are the known unknowns of a project?
SOLVED TEST PAPER GRADED A+
◉ What is Anaplan Planual?
Answer: The Planual provides a systematic set of standards for
model building on the Anaplan platform.
Designed to produce the most efficient, usable, and scalable Anaplan
models, while dramatically increasing performance for models in all
contexts.
◉ When to create a change communication plan?
Answer: During project planning.
Adjust this plan throughout the release phases.
◉ What are all the phases of Anaplan implementation?
Answer: 1. Pre-release
2. Foundation
3. Implementation
4. Testing
5. Deployment
◉ When does Pre-release phase begin?
,Answer: When a customer asks for an estimate.
Complete a form & participate in short scoping session --> Rough cut
estimate.
If decides to move forward --> full scope meeting --> Statement of
Work (SOW).
Once SOW signed --> project is added to the implementation project
schedule.
◉ What is Statement of Work and what does it define?
Answer: The Statement of Work is a letter of intent. It definesL
- project-specific activities
- project deliverables
- project timeline
- business requirements
- pricing
◉ What SOW estimates?
Answer: - size of the model (memory requirement or size in
memory)
- scope of work (business requirements)
- level of effort to design and build the model
◉ What are model size considerations?
, Answer: - each cell is approx 10 bytes of data
- also include memory for the list members and list properties
- can't use this method to calculate size of a Polaris model
◉ User base and concurrency estimates
Answer: - who will be accessing the model and how often?
- having an accurate estimate of how many users will be using
Anaplan at the same time is critical to building the model to meet
performance expectations.
- a distributed model may be required
◉ What is scope of work?
Answer: defines all the business requirements
◉ What does project scope describe?
Answer: - current state overview
- project objectives
- a high level drawing of the ecosystem, with the Anaplan solution
identified
- known unknowns
◉ What are the known unknowns of a project?