• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

BICSI TECHNICIAN STUDY GUIDE UPDATED ACTUAL Exam Questions and CORRECT Answers | Simplified Cheat Sheet | A+ Verified

Document preview thumbnail
Preview 3 out of 21 pages

BICSI TECHNICIAN STUDY GUIDE UPDATED ACTUAL Exam Questions and CORRECT Answers | Simplified Cheat Sheet | A+ Verified

Content preview

BICSI TECHNICIAN STUDY GUIDE UPDATED ACTUAL Exam
Questions and CORRECT Answers | Simplified Cheat Sheet | A+
Verified

Question 1.
A Drawings

Correct Answer: Architectural Drawings. A graphical representation of a
building, space, or object with adequate detail to convey design information in
a manner to serve as a guide for construction.


Question 2.
E Drawings

Correct Answer: Electrical Drawings. A graphical representation of the
electrical components of a construction project.


Question 3.
FP Drawings

Correct Answer: Fire Protection Drawings


Question 4.
M Drawings

Correct Answer: Mechanical Drawings


Question 5.
P Drawings

Correct Answer: Plumbing Drawings


Question 6.
S Drawings

Correct Answer: Structural Drawings


Question 7.
S.O.W

Correct Answer: Scope of Work. Covers the requirements for the ICT systems
team. The S.O.W document lists all of the elements of the installation.
Provides detailed statements and descriptions of the work content for the
project requirements.

,Question 8.
T Drawings

Correct Answer: Telecommunications Drawings. Covers telecom, security, and
audio/visual components of a project.
• T.0 -✓✓Layer of the telecom drawings that contains campus or site
information such as exterior pathways and interbuilding systems.


Question 9.
T1

Correct Answer: Layer of telecom drawings that contains buiilding
information.


Question 10.
T2

Correct Answer: Layer of telecom drawings that contains zone serving
information.


Question 11.
T3

Correct Answer: Layer of telecom drawings that contains information about
telecom room buildout.


Question 12.
T4

Correct Answer: Layer of telecom drawings that contains detail drawings.


Question 13.
T5

Correct Answer: Layer of telecom drawings that contains schedules and
spreadsheets.


Question 14.
B.O.M

Correct Answer: Bill of Materials. A list of the quantity and specific types of
materials to be used on a project. This list also should consider miscellaneous
hardware.

, Question 15.
Hazard

Correct Answer: Term used to describe the potential for harm,. In practical
terms, a hazard ofen is associated with a condition or activity that, if left
uncontrolled, can result in an injury or illness.


Question 16.
O&M

Correct Answer: Abbreviation for operations and maintenance.


Question 17.
PPE

Correct Answer: Personal Protective Equipment. Any number of safety
apparatuses worn or used by an individual that shield against possible injury
while performing tasks.
• Authority Having Jurisdiction (AHJ) -✓✓The building official, electrical
inspector, fire marshal, or other individuals or entities responsible for
interpretationand enforcement of local building and electrical codes.


Question 18.
ANSI

Correct Answer: American National Standards Institute. A private, nonprofit
membership organization focused on meetings standards and conformity
assessment requirements of its diverse constituency. It provides a neutral
forum for the development of consensus agreements on issues relevant to
voluntary standardization. The U.S. representative to the International
Organization for Standardization (ISO), and through the U.S. National
Committee, to the International Electrotechnical Comission (IEC).


Question 19.
Code

Correct Answer: A rule or set of rules intended to ensure safety during the
installation and use of materials, components, fixtures, systems,premises,
and related subjects.


Question 20.
Information and Communications Technology (ICT) System

Correct Answer: The cabling, pathways, rooms and spaces, wireless systems,
racks, power, grounding, cooling, and other infrastructure required to support
the transportation of voice and data signaling between communication, data

Document information

Uploaded on
October 5, 2026
Number of pages
21
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
27
Followers
1
Items
11669
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions