CE 366 EXAM 1 UPDATED ACTUAL
QUESTIONS AND CORRECT ANSWERS
Question:
1. Characteristics of Construction Projects
Answer:
• Time (schedule)
• Cost overrun
• Complexity
• Risk
• Safety
• Turnover
• Conflict/Litigation (claims are 1% of cost)
• Dynamic
• Unique
• Fragmented
• Non standardized production process (unlike manufacturing)

Question:
2. Construction Vs. Manufacturing
Answer:
Construction:
-Worksites are not permanent
-Finished product is unique
-Requires highly skilled craftsmen
-Capital is locked (more risk)
-Operators are subject to weather
-Owner is typically highly involved Manufacturing:
-Products designed and produced with a designated purchaser
-Manufacturing: smaller units, larger batches
-Manufacturing: easy to advertise

Question:
3. Construction Project Lifecycle
Answer:
a framework that outlines the stages a construction project which goes through from start to finish.

Question:
4. Project Lifecycle Stages
Answer:
1. Planning (FEP, front end planning/ feasibility study)
2. Design (drawings and specifications)
3. Procurement (general contractor, sub contractors)
4. Construction (project start and finish)
5. Operation and Maintenance (facility turned over)
6. Demolition (reuse)

, Question:
5. Stakeholders
Answer:
1. Owner may be:
- public or private
2. Designer (Architect, Structural Engineer, etc.)
- The design professional
- Typically, internal to owner and under contract with the owner
3. General Contractor (Prime contractor)
- single-contract system
- separate contracts for independent primes: managed by the owner, the architect-engineer, or a hired
construction manager.
4. Specialty Contractor (Sub-contractors)
5. Vendors and Suppliers

Question:
6. Project Deliver Systems
Answer:
- DBB (Traditional method: designer and contractor are separate)
- CMAR (CM is hired early to give input during design)
- DB (One contract for both design and construction)
- IP (All major parties share risk and reward, under one contract)

Question:
7. Business Management vs. Project Management
Answer:
Business Management- Long term stability, SOPs (standard operating procedures), strategy Project
Management- specific project, bidding, scheduling, QA/QC, multiple organizations, on time on
budget

Question:
8. The Project Manager
Answer:
takes ultimate responsibility for the project, manages multiple jobs, organizes plans schedules and
controls the work field

Question:
9. Construction Project Management
Answer:
provides professional management services to the owner of a construction project with the objective of
achieving high quality at minimum cost

Question:
10. Construction Management Procedures
Answer:
1. Cost, within contract budget
2. Quality, meetings specs and adding value
3. Time, with contract duration
4. Safety, No accidents

Infos sur le Document

Publié le
3 octobre 2026
Nombre de pages
10
Écrit en
2026/2027
Type
Examen
Contient
Questions et réponses
$13.49

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
STANFORDGRADESS
4.0
(242)
Vendu
1685
Abonnés
109
Éléments
121806
Dernière vente
6 heures de cela



Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Vous travaillez sur vos références ?

Créez des citations précises en APA, MLA et Harvard avec notre générateur de sources gratuit.

Vous travaillez sur vos références ?

Foire aux questions