1. Which ethical principle is essential for maintaining public trust in
defense acquisition?
A) Confidentiality only
B) Transparency, honesty, and accountability — Correct Answer
C) Profit maximization at all costs
D) Prioritizing schedule over ethics
Rationale: Transparency, honesty, and accountability uphold
integrity and public confidence in acquisition processes. Ethical
conduct is foundational to the defense acquisition workforce's
credibility.
,2. A program manager discovers that a contractor has been
overcharging on a cost-plus contract. The PM should:
A) Ignore the issue to avoid project delays
B) Report the issue through appropriate channels and document
findings — Correct Answer
C) Negotiate a private settlement without informing leadership
D) Approve the charges to maintain good relations
Rationale: Ethical obligations require reporting suspected fraud or
overcharging through proper channels. Transparency and
accountability protect both the government and the acquisition
process.
3. Which acquisition pathway emphasizes rapid development of
mature technologies within a 5-year period?
A) Major Capability Acquisition
B) Middle Tier of Acquisition — Correct Answer
,C) Urgent Capabilities
D) Software Pathway
Rationale: The Middle Tier of Acquisition is designed for rapid
acquisition with mature technologies, typically within 5 years. It
emphasizes prototyping and iterative development.
4. The primary purpose of Milestone C is to:
A) Approve full-rate production and deployment — Correct
Answer
B) Initiate system development
C) Conduct operational testing only
D) Approve system disposal
Rationale: Milestone C authorizes full-rate production and
operational deployment based on system readiness. It follows
successful operational testing and evaluation.
, 5. Which component of the DoD acquisition process involves
developing physical system designs and prototypes?
A) Technology Development phase
B) Engineering and Manufacturing Development phase — Correct
Answer
C) Operations and Support phase
D) Disposal phase
Rationale: The Engineering and Manufacturing Development phase
involves developing physical system designs and prototypes.
6. Which aspect of supply chain management is vital for ensuring the
security of critical components?
A) Supplier diversification and vetting — Correct Answer
B) Lowest cost sourcing only