• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 84 pages
Exam (elaborations)

DBIA Certification Exam Newest 2026/2027 Questions and Correct Detailed Answers Already Graded A+

Document preview thumbnail
Preview 4 out of 84 pages

DBIA Certification Exam Newest 2026/2027 Questions and Correct Detailed Answers Already Graded A+

Content preview

DBIA Certification Exam Newest 2026/2027 Questions
and Correct Detailed Answers Already Graded A+



What is Course of Performance? - CORRECT ANSWER-A way in which a court
can attempt to interpret ambiguous contracts. In this case, considering what the
parties do during the performance of this contract.



What is Course of Conduct? - CORRECT ANSWER-A way in which a court can
attempt to interpret ambiguous contracts. In this case, considering what the
parties do during the performance of similar contracts.



What is Terms of Art? - CORRECT ANSWER-A way in which a court can attempt
to interpret ambiguous contracts. In this case, considering what the use of the
word in a specific industry.



What are contract approaches? - CORRECT ANSWER-How the design-builder is
paid



What is a lump sum contract approach? - CORRECT ANSWER-- single price
regardless of actual cost

- no transparency

,- owner has limited audit rights

- undisclosed contingencies

- minimal owner involvement in trade partner engagement

- straightforward contract administration



What is a GMP contract approach? - CORRECT ANSWER-- compensation based
on actual cost + DB fee up to GMP

- open book pricing

- owner has broad audit rights

- most contingencies are transparent

- greater owner involvement in trade partner engagement

- complex contract administration

- savings under GMP must be addressed



What are some considerations when selecting a GMP contract approach? -
CORRECT ANSWER-- timing. How far will the design be advanced before a

GMP is offered? Appropriate level of cost escalation risk?

- contingency. purpose, amounts, authorizations of use.

- basis for shared savings

- no line-item guarantees. E.g. GCs can be capped

,- GMP proposal scope assumptions. Shared understanding by all parties, basis of
design documentation.



How does timing play a role in GMP contracting considerations? - CORRECT
ANSWER-How far will the design be advanced before a GMP is offered?

Appropriate level of cost escalation risk?



What considerations need to be made when establishing contingencies in a GMP?
- CORRECT ANSWER-purpose, amounts, authorizations of use.




What must be established when considering savings or overruns in a GMP
contract approach? - CORRECT ANSWER-basis of shared savings, if any



What procurement considerations should an owner make when choosing to
proceed with PDB delivery model? - CORRECT ANSWER-Qualifications based
selection

- engage the DBer in an integrated and cohesive strategic partnership for the
development of the project

- focuses primarily on qualifications and proposer's integrated process for
selection of design-builder

- formalizes the joint effort of advancing the design to a point of mutual
commitment after selection of DBer

, What are the characteristics of a DB team that an owner should select in a
qualifications based selection process? - CORRECT ANSWER-- will work well
and collaboratively in an integrated fashion with the Owner team

- will provide fully transparent pricing throughout the development of scope,
schedule and contract price

- will offer an approach that has the best likelihood to meet the Owner's goals and
required outcomes

- owner believes they are trustworthy, fair and highly qualified



What is Collaborative Project Delivery? - CORRECT ANSWER-- a collection of
project delivery systems

- early engagement of all team members

- collaboration in atmosphere based on trust, transparence and mutual respect



What are some examples of Collaborative Project Delivery? - CORRECT
ANSWER-- Design-Build

- Construction Management at Risk

- Public-Private Partnerships

- Integrated Project Delivery

Document information

Uploaded on
September 30, 2026
Number of pages
84
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
emilywambura
3.8
(15)
Sold
63
Followers
12
Items
6260
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions