• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 336 pages
Exam (elaborations)

Sos Nerc Prep Exam Script Comprehensive Study Guid

Document preview thumbnail
Preview 4 out of 336 pages

SOS NERC PREP EXAM SCRIPT COMPREHENSIVE STUDY GUID

Content preview

SOS NERC PREP EXAM SCRIPT
COMPREHENSIVE STUDY GUIDE

●● A Balancing Authority has a sudden loss of a large block of load in
its area. This loss will be seen instantaneously in the change of which of
the following values?


1. Actual Net Interchange
2. Scheduled Frequency
3. Scheduled Net Interchange
4. Area Control Error


A) 4 only
B) 1 & 3
C) 1 & 4
D) 3 & 4
Answer: C) 1 & 4


●● Metered Data included in the calculation of ACE are: dynamic
schedules, pseudo ties, actual frequency, and all __________.

,A) Tie lines readings
B) Generators output
C) Scheduled frequency indications
D) Transformer load
Answer: A) Tie lines readings


●● Balancing Authority A is currently reading a system frequency of
60.00 Hz. Its Net Actual Interchange is +100 MW and its Net Scheduled
Interchange is +200 MW. If Balancing Authority A's frequency bias
setting is 100 MW/0.1 Hz, what is ACE?


A) -100
B) 0
C) 10
D) 100
Answer: A) -100


●● A Balancing Authority has a Net Interchange Schedule of -250 MWs
from 1200 to 1600 on a summer day. The Net Interchange Actual for
those same hours respectively were -230 MW, -275 MW, -250 MW and -
270 MW. What was the Balancing Authority's Inadvertent Interchange
for the 4-hour period?


A) 6 MWs out

,B) 25 MWs in
C) 25 MWs out
D) 6 MWs in
Answer: B) 25 MWs in


●● For the ACE equation to work properly, dynamic schedules, pseudo
ties, frequency, and all ________________ must be metered.


A) Generation
B) Communications
C) Transformers
D) Tie lines
Answer: D) Tie lines


●● If the frequency bias setting is set to a less negative value than the
frequency response of a Balancing Authority and a frequency increase is
caused by a sudden loss of load in an external balancing area, what will
be the result?


A) The ACE will be zero and will take no AGC action


B) The ACE will be a negative value and AGC will increase generation

, C) The ACE will be a positive value and AGC will lower generation


D)This will not affect the ACE
Answer: B) The ACE will be a negative value and AGC will increase
generation


●● If the frequency bias setting is less negative than the frequency
response of a Balancing Authority and a frequency decline is caused by
a sudden loss of generation in an external balancing area, what will be
the result?


A) The ACE will be a negative value and AGC will increase generation.


B) This will not affect the ACE.


C) The ACE will be a positive value and AGC will lower generation.


D) The ACE will be zero and will take no AGC action.
Answer: C) The ACE will be a positive value and AGC will lower
generation.


●● It is the responsibility of which entity/entities to develop, maintain,
and implement load shedding plans?

Document information

Uploaded on
September 30, 2026
Number of pages
336
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
40
Followers
1
Items
25723
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions